SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : CPI Aerostructures (CVU)- Take a Look (was CPI)
CVU 2.510-9.4%11:15 AM EDT

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: leigh aulper who wrote (153)8/23/2004 10:58:34 PM
From: leigh aulper   of 213
 
MODERNIZING THE C-5
Refurbishing the C-5 will occur in two phases: The avionics phase now under way would upgrade electronics, controls, cockpits instruments and control systems and cost $3.5 million for each plane. The second phase would not begin until 2007. It would replace engines, landing gears and power supplies and raise the cost to $75 million a plane. There are 112 C-5s in the Air Force fleet.
Cockpit

A collision-avoidance system was installed in 2002 that provides electronic alerts to pilots when other planes are close. The system allows a pilot to use cockpit instruments to track up to 50 planes within an 80-mile radius.

Digital displays and equipment will replace '60s-era analog cockpit instruments, making for what Lockheed Martin, the contractor, describes as an "eight-fold improvement in avionics reliability." Upgrades include seven new 6-by-8-inch liquid crystal displays, laptop-size computer screens that replace various dials, wheels, tapes and assorted moving parts. Improvements also will include an embedded satellite global position/inertial navigation system.

Fuselage

Skin and frame upgrades are scheduled in the second phase.

Wings

Wings on the oldest C-5s were replaced between 1981 and 1986. No major wing updates are scheduled, but that could change after a C-5 now being cut into pieces is analyzed for structural integrity.

Engine

Existing General Electric turbofan engines with 43,000 pounds of thrust would be replaced in the second phase with more powerful GE commercial engines with 9,000 pounds more thrust. That would mean C-5s could use shorter runways, allowing them to get into and out of locations in more remote areas.

Landing gear

The 28-wheel landing gear has long been a problem, causing many of the repair problems that make the jet transport less reliable than it needs to be. The gear would be improved in the second phase.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext