We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : Sioux Nation
DJT 17,535+1.0%Jan 2 3:59 PM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Travis_Bickle who wrote (190750)5/2/2010 1:22:08 PM
From: Wharf Rat   of 362052
 
A comment from one of my main men on this; Rocky's been there, done all that...

DYI
According to the survivor's audio report, they were moving from drilling to production, and had cemented the casing and flushed the mud out with seawater. (pardon my lack of terminology, I'm only an armchair observer)

So the DH project was at its most absolutely vulnerable stage when this blowout occurred.


[new] ROCKMAN on May 2, 2010 - 11:02am
Actually DYI just the opposite. When first drilling into the formation is the greatest risk. Then it's risky when you're running and cementing the casing. They were in the process of temporarily abandoning the well. The well should have been in it's safest mode. They were in the process of removing the drilling mud from the riser; the very next step would have been REMOVING THE BOP. How safe must you believe the situation to be to do that?

That’s the bizarre aspect: I’ve never heard of a blow out occurring at this point. Needless to say something in the down hole plumbing failed.
Report TOU ViolationShare This Post