NNE reports HOLES 4,5 ans 6 !!!
Assay results from Jiawula Naneco Minerals Ltd NNE Shares issued 17,668,496 Sep 30 close $0.36 Wed 30 Sept 98 News Release Mr. Archie Nesbitt reports, Continued drilling on Naneco Minerals Ltd.'s Jiawula zinc-silver-lead-copper deposit in Nei Mongolia, China, has again intercepted highly significant massive to semi-massive sulphide mineralization within zone No. 2 in core holes J-98-4, J-98-5, J-98-6. Of particular significance in hole J-98-4 is the 10.0m (32.8 ft) interval from 188.0m to 198.0m with weighted averages 260.0 g/mt silver, 1.05 per cent copper, and 19.58 per cent combined lead-zinc. Additionally, an interval in hole J-98-5 from 124.6m to 132m (24.3 ft) graded 160.52 g/mt silver, 0.52 per cent copper, and 19.2 per cent combined lead-zinc and a 3.8m (12.5 ft) interval in hole J-98-6 intercepted grades of 240.2 g/mt silver, 1.07 per cent copper, and 22.07 per cent combined lead-zinc. The full intercepts and noted intervals are listed below.
Depth of Silver Copper Lead Zinc Intercept Values Values Values Values (metres) g/t % % %
Hole J-98-4
155.95-156.8 224.9 0.37 3.97 17.69 171.60-172.6 6.8 0.01 1.13 1.23 172.60-173.8 14.9 0.07 1.37 1.85 174.20-175.5 38.0 0.06 2.16 4.24 179.10-180.1 9.3 0.02 1.05 0.82 180.10-181.1 22.4 0.08 1.23 2.05 181.10-181.7 6.0 0.02 0.72 0.81 181.70-182.6 124.8 0.11 5.29 7.59 185.25-186.25 128.9 0.36 2.06 5.13 186.25-187.25 79.0 0.35 0.65 4.96 187.25-188.00 4.0 0.03 0.25 0.29 188.00-189.00 194.0 0.47 0.95 20.92 189.00-190.00 110.7 0.39 2.65 12.51 190.00-191.21 320.9 0.57 11.56 27.09 191.21-191.50 24.7 0.04 1.22 1.01 191.50-192.00 115.4 0.42 0.24 21.49 192.00-193.00 117.7 0.58 0.16 20.15 193.00-194.00 248.8 1.49 0.44 16.22 194.00-195.00 479.9 2.55 0.99 7.68 195.00-196.00 462.2 2.20 1.14 10.25 196.00-197.00 349.8 0.97 0.66 19.62 197.00-198.00 183.7 0.95 0.77 22.39
From 188.00-189.00 = 10.00m 259.99 1.05 2.22 17.36 198.00-199.40 17.8 0.08 0.83 2.09
Weighted Average over 22.0m 147.67 0.55 1.94 10.04
Hole J-98-5
124.6 -125.6 159.8 0.69 16.51 11.52 125.6 -126.6 164.5 0.57 14.86 8.5 126.6 -127.6 98.4 0.25 7.16 5.83 127.6 -128.6 200.8 0.3 9.14 7.79 128.6 -129.6 192.1 0.57 3.12 17.99 129.6 -130.6 127.5 0.47 1.69 10.05 130.6 -132.0 174.8 0.71 2.66 17.02
From 124.6-132.0 = 7.4m 160.5 0.52 7.6 11.56
Hole J-98-5 continued
190.00-191.21 320.9 0.57 11.56 27.09 163.70-164.1 50.3 0.10 0.73 3.07 165.60-166.6 78.6 0.08 0.96 6.0 166.60-167.6 44.0 0.21 0.72 1.12 167.60-168.6 25.4 0.04 1.71 3.67 168.60-169.8 8.0 0.01 0.64 0.86
Weighted average over 12m 113.8 0.35 5.05 8.21
Hole J-98-6 190.00-191.21 320.9 0.57 11.56 27.09 127.50-128.5 68.7 0.10 5.60 2.02 128.50-129.5 32.1 0.13 1.15 1.92 129.50-130.5 165.4 0.21 8.91 10.85 130.50-131.5 78.5 0.13 5.24 9.74 131.50-132.5 20.4 0.05 2.22 1.81 132.50-133.5 22.4 0.10 2.29 2.65 133.50-134.5 101.2 0.17 7.59 4.32 134.50-135.5 118.3 0.16 7.03 5.09 135.50-136.5 70.7 0.09 5.44 3.93 136.50-137.1 100.5 0.20 7.58 6.75 137.1 -138.1 379.2 1.28 2.63 18.58 138.1 -138.55 255.4 1.33 8.16 24.10 138.55-138.9 171.7 0.74 1.67 32.66 138.9 -139.9 260.5 1.22 7.42 12.83 139.9 -140.9 97.9 0.72 1.90 13.98
From 137.1-138.1 = 3.8 m 240.2 1.07 4.26 17.81
140.90-141.9 84.6 0.83 1.25 6.26 141.90-142.9 95.2 0.22 3.98 4.50 142.90-143.9 19.8 0.08 0.70 1.86 143.90-144.6 73.7 0.23 0.95 4.36
Weighted average over 17.1m 111.22 0.39 4.3 7.59 Earlier results from holes J-98-1, J-98-2, and J-98-3 were as follows: J-98-1 intercepted a 17.1 metre interval (56.1 ft) grading 171.6 g/mt silver, 0.21 per cent Cu, 6.91 per cent Pb, and 4.14 per cent Zn which contained a 3.5m (11.5 ft) interval grading 439.3 g/mt silver, 0.64 per cent Cu, and 25.0 per cent combined Pb-Zn. J-98-2 intercepted 2.5 metres (8.2 ft) grading 313.04 g/mt silver, 0.5 per cent copper, 15.53 per cent lead, and 11.56 per cent zinc. J-98-3 intercepted 3.0 metres (9.8 ft) grading 191.87 g/mt silver, 0.34 per cent copper, 11.82 per cent lead, and 10.95 per cent zinc. Naneco's technical staff continues to be encouraged by both the substantial thickness and extremely high grades encountered in the confirmation and exploratory drilling. Naneco's staff further believes these data support the tremendous potential of the Jiawula district where Naneco holds a 700 square kilometre area of interest. The Jiawula deposit zone No. 2 currently being tested is only one of forty identified outcropping zones of silver-copper-lead-zinc mineralization in Naneco's area of interest. Naneco has completed a total of 30 confirmation and exploration core holes to-date on Jiawula No. 2 zone with sample cutting completed on-site and one-half core samples being shipped to ITS in Vancouver for assaying. The remaining one-half core is stored at the Jiawula mine site. Assays will be reported as available. Drilling will continue through 1998 to explore further along the trend of zone No. 2 and to expand on the known mining resource. NNE reports HOLES 4,5 ans 6 !!!
Assay results from Jiawula Naneco Minerals Ltd NNE Shares issued 17,668,496 Sep 30 close $0.36 Wed 30 Sept 98 News Release Mr. Archie Nesbitt reports, Continued drilling on Naneco Minerals Ltd.'s Jiawula zinc-silver-lead-copper deposit in Nei Mongolia, China, has again intercepted highly significant massive to semi-massive sulphide mineralization within zone No. 2 in core holes J-98-4, J-98-5, J-98-6. Of particular significance in hole J-98-4 is the 10.0m (32.8 ft) interval from 188.0m to 198.0m with weighted averages 260.0 g/mt silver, 1.05 per cent copper, and 19.58 per cent combined lead-zinc. Additionally, an interval in hole J-98-5 from 124.6m to 132m (24.3 ft) graded 160.52 g/mt silver, 0.52 per cent copper, and 19.2 per cent combined lead-zinc and a 3.8m (12.5 ft) interval in hole J-98-6 intercepted grades of 240.2 g/mt silver, 1.07 per cent copper, and 22.07 per cent combined lead-zinc. The full intercepts and noted intervals are listed below.
Depth of Silver Copper Lead Zinc Intercept Values Values Values Values (metres) g/t % % %
Hole J-98-4
155.95-156.8 224.9 0.37 3.97 17.69 171.60-172.6 6.8 0.01 1.13 1.23 172.60-173.8 14.9 0.07 1.37 1.85 174.20-175.5 38.0 0.06 2.16 4.24 179.10-180.1 9.3 0.02 1.05 0.82 180.10-181.1 22.4 0.08 1.23 2.05 181.10-181.7 6.0 0.02 0.72 0.81 181.70-182.6 124.8 0.11 5.29 7.59 185.25-186.25 128.9 0.36 2.06 5.13 186.25-187.25 79.0 0.35 0.65 4.96 187.25-188.00 4.0 0.03 0.25 0.29 188.00-189.00 194.0 0.47 0.95 20.92 189.00-190.00 110.7 0.39 2.65 12.51 190.00-191.21 320.9 0.57 11.56 27.09 191.21-191.50 24.7 0.04 1.22 1.01 191.50-192.00 115.4 0.42 0.24 21.49 192.00-193.00 117.7 0.58 0.16 20.15 193.00-194.00 248.8 1.49 0.44 16.22 194.00-195.00 479.9 2.55 0.99 7.68 195.00-196.00 462.2 2.20 1.14 10.25 196.00-197.00 349.8 0.97 0.66 19.62 197.00-198.00 183.7 0.95 0.77 22.39
From 188.00-189.00 = 10.00m 259.99 1.05 2.22 17.36 198.00-199.40 17.8 0.08 0.83 2.09
Weighted Average over 22.0m 147.67 0.55 1.94 10.04
Hole J-98-5
124.6 -125.6 159.8 0.69 16.51 11.52 125.6 -126.6 164.5 0.57 14.86 8.5 126.6 -127.6 98.4 0.25 7.16 5.83 127.6 -128.6 200.8 0.3 9.14 7.79 128.6 -129.6 192.1 0.57 3.12 17.99 129.6 -130.6 127.5 0.47 1.69 10.05 130.6 -132.0 174.8 0.71 2.66 17.02
From 124.6-132.0 = 7.4m 160.5 0.52 7.6 11.56
Hole J-98-5 continued
190.00-191.21 320.9 0.57 11.56 27.09 163.70-164.1 50.3 0.10 0.73 3.07 165.60-166.6 78.6 0.08 0.96 6.0 166.60-167.6 44.0 0.21 0.72 1.12 167.60-168.6 25.4 0.04 1.71 3.67 168.60-169.8 8.0 0.01 0.64 0.86
Weighted average over 12m 113.8 0.35 5.05 8.21
Hole J-98-6 190.00-191.21 320.9 0.57 11.56 27.09 127.50-128.5 68.7 0.10 5.60 2.02 128.50-129.5 32.1 0.13 1.15 1.92 129.50-130.5 165.4 0.21 8.91 10.85 130.50-131.5 78.5 0.13 5.24 9.74 131.50-132.5 20.4 0.05 2.22 1.81 132.50-133.5 22.4 0.10 2.29 2.65 133.50-134.5 101.2 0.17 7.59 4.32 134.50-135.5 118.3 0.16 7.03 5.09 135.50-136.5 70.7 0.09 5.44 3.93 136.50-137.1 100.5 0.20 7.58 6.75 137.1 -138.1 379.2 1.28 2.63 18.58 138.1 -138.55 255.4 1.33 8.16 24.10 138.55-138.9 171.7 0.74 1.67 32.66 138.9 -139.9 260.5 1.22 7.42 12.83 139.9 -140.9 97.9 0.72 1.90 13.98
From 137.1-138.1 = 3.8 m 240.2 1.07 4.26 17.81
140.90-141.9 84.6 0.83 1.25 6.26 141.90-142.9 95.2 0.22 3.98 4.50 142.90-143.9 19.8 0.08 0.70 1.86 143.90-144.6 73.7 0.23 0.95 4.36
Weighted average over 17.1m 111.22 0.39 4.3 7.59 Earlier results from holes J-98-1, J-98-2, and J-98-3 were as follows: J-98-1 intercepted a 17.1 metre interval (56.1 ft) grading 171.6 g/mt silver, 0.21 per cent Cu, 6.91 per cent Pb, and 4.14 per cent Zn which contained a 3.5m (11.5 ft) interval grading 439.3 g/mt silver, 0.64 per cent Cu, and 25.0 per cent combined Pb-Zn. J-98-2 intercepted 2.5 metres (8.2 ft) grading 313.04 g/mt silver, 0.5 per cent copper, 15.53 per cent lead, and 11.56 per cent zinc. J-98-3 intercepted 3.0 metres (9.8 ft) grading 191.87 g/mt silver, 0.34 per cent copper, 11.82 per cent lead, and 10.95 per cent zinc. Naneco's technical staff continues to be encouraged by both the substantial thickness and extremely high grades encountered in the confirmation and exploratory drilling. Naneco's staff further believes these data support the tremendous potential of the Jiawula district where Naneco holds a 700 square kilometre area of interest. The Jiawula deposit zone No. 2 currently being tested is only one of forty identified outcropping zones of silver-copper-lead-zinc mineralization in Naneco's area of interest. Naneco has completed a total of 30 confirmation and exploration core holes to-date on Jiawula No. 2 zone with sample cutting completed on-site and one-half core samples being shipped to ITS in Vancouver for assaying. The remaining one-half core is stored at the Jiawula mine site. Assays will be reported as available. Drilling will continue through 1998 to explore further along the trend of zone No. 2 and to expand on the known mining resource. |