TO ALL: The following news release I found about Abitibi--sounds great but I for one don't understand exactly what it is saying. Is this the news that should start the ball rolling on this stock???
Thanks
Regards
Stevie
Subject: Abitibi Mining Corp. Date: Mon, 14 Apr 1997 15:46:47 -0700 From: Linda Chu <lindachu@uniserve.com> Please find below a copy of the Company's latest news release for your perusal. If you have any questions, please feel free to contact our Investor Relations Departement, Mr. Bill Basarab or Mr. Andrew Sloan, at (604) 685-2222. Thank you very much.
April 14, 1997 A B B #12-97 S D N #16-97
JOINT NEWS RELEASE
More gold intersections on Tannahill Project
Abitibi Mining Corp. and Sedex Mining Corp. are encouraged by assay results from the current phase of drilling on the Tannahill Project. A total of ten diamond drill holes have been completed on the Tannahill gold zone, of which assay results are available for the first nine holes (T-97-30 to T-97- 38). All holes were drilled between the 50 metre level and the 175 metre level, along 300 metres of strike length, to test the down dip continuity of the gold bearing structure.
All drill holes successfully intersected the gold bearing structure, further indicating the excellent continuity of the zone. Better gold intersections from this phase of drilling include 5.21 gm/t over 1.75 metres, 4.54 gm/t over 2.00 metres, and 4.83 gm/t over 1.90 metres. Split core, fire assay results for all nine completed holes are enclosed in the following Table 1:
Table 1: Tannahill Assay Results
DDH # From m To m Width m gm/t T-97-30 106.00 108.00 2.00 2.76 T-97-31 121.00 124.00 3.00 2.02 T-97-32 71.00 72.75 1.75 5.21 T-97-33 197.50 199.50 2.00 4.54 T-97-34 211.10 213.00 1.90 4.83 T-97-35 187.50 188.50 1.00 0.20 T-97-36 208.50 209.45 0.95 0.17 T-97-37 179.00 181.00 2.00 1.89 T-97-38 197.00 198.00 1.00 0.41
Two drill holes remaining in this program are planned to test the structure below the current limit of drilling. T-97-39 (awaiting assays) will test the structure at the 250 metre level, and T-97-40 (currently being drilled), will test the structure at the 350 metre level. The companies are extremely encouraged by the continuity of the gold bearing structure. With the high level of success in intersecting the structure at shallow levels, deeper drilling will attempt to test the zone below the 300 metre level. It is below this depth that the Holloway J.V. Mine and Holt McDermott Mine develop into economic gold deposits. Based upon the excellent continuity of the structure and significant gold assays to date ( 5.16 gm/t / 5.0 metres in T-96-9, 4.80 gm/t / 5.00 metres in T-96-11, and 7.02 gm/t / 3.7 metres in T-96-15), the zone holds excellent promise at depth.
On behalf of the Board of Directors,
ABITIBI MINING CORP. SEDEX MINING CORP.
"Victor G. Coulthard, Director"
The Vancouver Stock Exchange has not reviewed and does not accept responsibility for the accuracy of this release. |