SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : BGM

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: howestreetbull7/28/2017 9:02:43 AM
   of 127
 
by @newswire on July 27, 2017
BGM Intersects 29.95 g/t Au Over 8.85 Metres at Shaft Zone

DEEP DRILLING INTERSECTS 11.93 G/T AU OVER 7.15 METRES

TORONTO, July 27, 2017 /CNW/ - Barkerville Gold Mines Ltd. (TSXV: BGM) (the "Company" or "Barkerville") is pleased to announce additional drilling results from the ongoing 130,000 metre Phase II Island Mountain exploration drilling program at the Company's flagship Cariboo Gold Project. The Company is currently exploring and delineating the Valley and Shaft Zones with seven drill rigs, while an eighth drill rig is conducting exploratory drilling on Barkerville Mountain. Given the continued drilling success at the project, the Company has ordered two additional drill rigs for early August 2017 bringing the total number of operating rigs to ten. Detailed drilling results, a drill hole location plan map, level plan and longitudinal section are presented at the end of this release.

Drilling Highlights:

  • IM-17-104: 11.93 g/t Au over 7.15 metres
  • IM-17-109: 12.19 g/t Au over 5.55 metres
  • IM-17-111: 15.94 g/t Au over 3.00 metres
  • IM-17-113: 29.95 g/t Au over 8.85 metres
  • IM-17-115: 10.14 g/t Au over 4.00 metres
  • IM-17-116: 11.68 g/t Au over 3.00 metres
  • IM-17-104: 11.93 g/t Au over 7.15 metres


  • True widths cannot be accurately determined from the information available therefore core lengths are reported.

    Shaft Zone Veining Expands at Depth

    Continuity and extensions of the Shaft Zone vein systems continues as demonstrated by drillhole
    IM-17-113 which intersected three separate corridors grading 10.84 g/t Au over 4.95 metres, 4.71 g/t Au over 10.25 metres followed by 29.95 g/t Au over 8.85 metres from 400 to 475 metres vertically below surface. These new intersections correlate along vein strike to the northeast with previously reported drillhole CM-17-023 which recently discovered veining grading 12.43 g/t Au over 7.20 metres and 5.22 g/t Au over 19.55 metres. These holes are separated by an untested 175 metre gap and are open for expansion.

    In the same portion of the Shaft Zone, drillhole IM-17-104 intersected additional veining grading
    11.93 g/t Au over 7.15 metres at a vertical depth of 450 metres below surface. This new occurrence is untested along vein strike for 275 metres to previously reported drillholes CM-17-014 and CM-17-045 which intersected 11.98 g/t Au over 4.35 metres and 5.41 g/t Au over 3.50 metres respectively.

    Qualified Persons

    Exploration activities at the Cariboo Gold Project are administered on site by the Company's Exploration Manager, Maggie Layman, P.Geo. As per National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President Exploration, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting its exploration activities on the Cariboo Gold Project.

    Quality Assurance – Quality Control

    Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently stored on site at the Company's secure facility in Wells, BC. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company's Qualified Person, Paul Geddes, P.Geo, Vice President Exploration.

    Drill core samples are submitted to ALS Geochemistry's analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 250 grams is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 1,000g screen metallic fire assay. A selected number of samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS).

    About Barkerville Gold Mines Ltd.

    The Company is focused on developing its extensive land package located in the historical Cariboo Mining District of central British Columbia. Barkerville's mineral tenures cover 2,110 square kilometres along a strike length of 67 kilometres which includes several past producing hard rock mines of the historic Barkerville Gold Mining Camp near the town of Wells, British Columbia. The QR Project, located approximately 110 kilometres by highway and all weather road from Wells was acquired by Barkerville in 2010 and boasts a fully permitted 900 tonne/day gold milling and tailings facility. Test mining of the Bonanza Ledge open pit was completed in March of 2015 with 91,489 tonnes of material milled producing 25,464 ounces of gold. The Company has completed several drilling and exploration programs over the past 20 years and has compiled this data with all historical information in order develop geologic models which are assisting management in defining new deposits in the Cariboo Gold Project. An extensive drill program is currently underway with the goal of delineating additional high grade gold mineralization.

    Cautionary Statement on Forward -Looking Information
    Neither the TSX Venture Exchange ('TSXV') nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements regarding exploration results and exploration plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

    Table 1: Length weighted gold composites for Valley and Shaft Zone drillholes:

    HOLE-ID

    FROM (M)

    TO (M)

    CORE LENGTH (M)

    AU (G/T)

    CM-17-056

    319.70

    320.90

    1.20

    6.13

    CM-17-056

    382.40

    382.90

    0.50

    28.20

    CM-17-058

    28.50

    29.70

    1.20

    1.25

    CM-17-059

    132.50

    136.00

    3.50

    8.54

    INCLUDING

    134.90

    135.40

    0.50

    12.25

    AND

    135.40

    136.00

    0.60

    26.10

    CM-17-059

    137.50

    138.00

    0.50

    6.18

    CM-17-059

    145.30

    146.20

    0.90

    7.03

    CM-17-059

    156.80

    157.30

    0.50

    10.30

    CM-17-059

    231.00

    231.50

    0.50

    11.10

    CM-17-059

    236.00

    236.50

    0.50

    7.20

    CM-17-060

    31.05

    32.20

    1.15

    5.09

    CM-17-061

    398.30

    399.00

    0.70

    27.20

    CM-17-062

    257.50

    258.05

    0.55

    8.25

    CM-17-062

    282.60

    283.10

    0.50

    35.60

    CM-17-062

    287.05

    288.55

    1.50

    7.71

    IM-17-104

    246.75

    247.45

    0.70

    8.66

    IM-17-104

    509.50

    509.90

    0.40

    16.45

    IM-17-104

    588.80

    595.95

    7.15

    11.93

    INCLUDING

    588.80

    589.40

    0.60

    13.70

    AND

    593.20

    593.90

    0.70

    8.90

    AND

    593.90

    594.40

    0.50

    114.50

    AND

    595.00

    595.95

    0.95

    8.67

    IM-17-108

    124.60

    125.40

    0.80

    10.25

    IM-17-108

    247.80

    250.00

    2.20

    17.40

    INCLUDING

    247.80

    248.30

    0.50

    70.20

    IM-17-108

    307.05

    307.80

    0.75

    17.00

    IM-17-108

    357.00

    358.00

    1.00

    24.40

    IM-17-108

    555.95

    557.00

    1.05

    17.95

    IM-17-108

    561.40

    564.70

    3.30

    7.50

    IM-17-108

    587.00

    587.50

    0.50

    14.15

    IM-17-108

    639.10

    639.60

    0.50

    13.10

    IM-17-108

    657.05

    657.55

    0.50

    7.20

    IM-17-108

    660.45

    662.50

    2.05

    19.42

    INCLUDING

    661.15

    661.85

    0.70

    56.00

    IM-17-108

    673.15

    673.65

    0.50

    13.60

    IM-17-109

    99.55

    105.10

    5.55

    12.19

    INCLUDING

    99.55

    100.50

    0.95

    44.50

    AND

    104.60

    105.10

    0.50

    34.70

    IM-17-110

    58.80

    60.30

    1.50

    42.40

    IM-17-110

    99.80

    100.30

    0.50

    13.15

    IM-17-110

    345.20

    346.10

    0.90

    8.55

    IM-17-110

    405.00

    405.80

    0.80

    14.10

    IM-17-110

    527.00

    527.75

    0.75

    32.90

    IM-17-110

    527.00

    527.75

    0.75

    32.90

    IM-17-110

    596.50

    597.00

    0.50

    33.70

    IM-17-110

    610.80

    611.50

    0.70

    8.04

    IM-17-111

    53.00

    56.00

    3.00

    15.94

    INCLUDING

    54.60

    55.10

    0.50

    93.40

    IM-17-112




    ASSAYS PENDING

    IM-17-113

    17.30

    18.00

    0.70

    8.87

    IM-17-113

    20.40

    21.00

    0.60

    15.40

    IM-17-113

    22.70

    23.75

    1.05

    19.00

    IM-17-113

    406.00

    406.95

    0.95

    9.40

    IM-17-113

    407.50

    408.50

    1.00

    6.88

    IM-17-113

    454.50

    455.10

    0.60

    19.50

    IM-17-113

    497.30

    502.25

    4.95

    10.84

    INCLUDING

    497.30

    497.90

    0.60

    22.70

    AND

    499.50

    500.75

    1.25

    21.10

    IM-17-113

    525.45

    526.40

    0.95

    7.15

    IM-17-113

    537.75

    548.00

    10.25

    4.71

    INCLUDING

    537.75

    538.25

    0.50

    19.80

    AND

    546.30

    547.10

    0.80

    12.60

    AND

    547.10

    548.00

    0.90

    26.20

    IM-17-113

    597.15

    606.00

    8.85

    29.95

    INCLUDING

    597.15

    597.65

    0.50

    17.95

    AND

    597.65

    598.15

    0.50

    18.05

    AND

    601.50

    602.00

    0.50

    108.00

    AND

    602.75

    603.35

    0.60

    23.30

    AND

    603.35

    604.50

    1.15

    154.50

    IM-17-114




    ABANDONED

    IM-17-115

    152.70

    153.20

    0.50

    54.80

    IM-17-115

    220.50

    221.00

    0.50

    7.58

    IM-17-115

    419.30

    423.30

    4.00

    10.14

    INCLUDING

    422.20

    422.70

    0.50

    8.85

    AND

    422.70

    423.30

    0.60

    54.70

    IM-17-116

    78.00

    81.00

    3.00

    11.68

    INCLUDING

    79.00

    79.50

    0.50

    43.30

    AND

    79.50

    80.15

    0.65

    19.55

    IM-17-116

    210.00

    213.00

    3.00

    8.59

    INCLUDING

    211.20

    212.00

    0.80

    9.64

    AND

    212.00

    213.00

    1.00

    17.05

    IM-17-116

    313.00

    314.00

    1.00

    7.77

    IM-17-116

    422.25

    433.70

    11.45

    5.02

    INCLUDING

    425.00

    426.20

    1.20

    16.25

    AND

    428.05

    429.20

    1.15

    23.70

    IM-17-116

    476.50

    479.55

    3.05

    8.83

    INCLUDING

    477.70

    478.30

    0.60

    36.10

    IM-17-116

    503.10

    504.20

    1.10

    24.46

    INCLUDING

    503.10

    503.60

    0.50

    52.50

    IM-17-117

    164.00

    164.50

    0.50

    25.20

    IM-17-117

    218.10

    218.60

    0.50

    13.55

    IM-17-117

    261.30

    262.20

    0.90

    17.30

    IM-17-117

    468.95

    470.00

    1.05

    14.85

    IM-17-118

    60.80

    62.00

    1.20

    17.75

    INCLUDING

    60.80

    61.40

    0.60

    34.50

    IM-17-118

    76.30

    77.40

    1.10

    10.75

    IM-17-118

    174.30

    174.80

    0.50

    10.50

    IM-17-118

    345.50

    346.00

    0.50

    9.41

    IM-17-118

    358.95

    359.60

    0.65

    9.45

    IM-17-118

    372.50

    374.00

    1.50

    7.63




    True widths cannot be accurately determined from the information available therefore core lengths are reported. Rock not recovered by drilling was assigned zero grade. Top cuts have not been applied to high grade assays. SHAFT = Shaft Zone, VALLEY = Valley Zone.

    Table 2: Drillhole Collar Orientations:

    HOLE-ID

    AZIMUTH

    DIP

    CM-17-058

    224.80

    -44.30

    IM-17-104

    131.60

    -61.50

    IM-17-108

    136.70

    -48.30

    IM-17-109

    136.80

    -63.80

    IM-17-110

    130.40

    -45.10

    IM-17-111

    135.70

    -44.00

    IM-17-113

    122.60

    -64.40

    IM-17-114

    127.70

    -42.80

    IM-17-115

    135.60

    -45.40

    IM-17-116

    138.30

    -64.60

    IM-17-117

    137.30

    -41.30

    IM-17-118

    140.60

    -43.60

    CM-17-056

    135.30

    -44.50

    CM-17-059

    307.50

    -45.00

    CM-17-060

    223.50

    -64.70

    CM-17-061

    312.00

    -55.90

    CM-17-062

    311.60

    -45.80










    SOURCE Barkerville Gold Mines Ltd.



    View original content with multimedia: newswire.ca

    Report TOU ViolationShare This Post
     Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext