SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: LoneClone who wrote (172316)6/12/2023 3:07:44 PM
From: LoneClone  Read Replies (1) of 193721
 
Novo Resources: Becher Drilling Continues to Intercept Significant Gold Mineralisation

finance.yahoo.com

Novo Resources Corp.
Mon, June 12, 2023 at 6:00 AM PDT·29 min read

Figure 1



Egina Gold Camp tenure showing the Becher and Nunyerry North Projects and the priority Becher prospects.
Figure 2



Becher Project with main prospects, AC drilling progress to date and planned AC drilling over interpreted geology.
Figure 3



Close up of the Heckmair-Irvine priority area with significant gold intercepts from 2022/2023 AC drilling programs, green callouts from recent results.
Figure 4



Nunyerry North high-grade shallow-dipping quartz vein-related gold mineralisation.

  • Ongoing aircore drilling (“AC”) at Becher continues to deliver significant intercepts (> 2 g*m in tenor), with key recent results including:

  • 39 m @ 0.25 g/t Au from 81 m including 3 m @ 0.41 g/t Au from 108 m in F1843

  • 18 m @ 0.38 g/t Au from 21 m including 9 m @ 0.56 g/t Au from 30 m also in F1843

  • 12 m @ 0.43 g/t Au from 57 m including 6 m @ 0.66 g/t Au from 60 m also in F1843

  • 30 m @ 0.2 g/t Au from 3 m including 3 m @ 0.38 g/t Au from 12 m in F1924

  • 13 m @ 0.35 g/t Au from 36 m including 10 m @ 0.42 g/t Au from 39 m also in F1924

  • 9m @ 0.39 g/t Au from 54m including 6 m @ 0.45 g/t Au from 54 m in F1838

  • 6m @ 0.36 g/t Au from 48m including 3 m @ 0.6 g/t Au from 51 m in F1881

  • Becher is Novo’s flagship project located in the northern sector of the Egina Gold Camp and 28 km along trend from De Grey Mining Limited’s 10.6 Moz Au (JORC 2012)1 Mallina Gold Project.

  • Novo has completed over 50,000 m of AC drilling to date at Becher with significant gold and multi-element assay results generated, defining a large priority area of mineralisation across some 5 sq km. The exciting results from this program have confirmed Novo’s plans to extend the drilling program.

  • Both geological setting and pathfinder multielement assays compare favourably to the adjacent Mallina Gold Project mineralisation, with planning for deeper drilling underway.

  • 720 AC holes for over 20,000 m have been completed in 2023, with majority on 320 m spaced infill drill lines at Heckmair and some on closer spaced lines at Irvine. Assays are pending for 80 holes.

  • Recent drilling, focused on gold anomalies previously identified in the Irvine Shear corridor in proximity to the Heckmair intrusion, continues to identify intercepts across a significant strike length.

  • The Nunyerry North Prospect, located in the southern section of the Egina Gold Camp, is the next target that Novo is progressing as part of its aggressive Pilbara exploration program.

  • A high-grade soil anomaly has previously been identified at Nunyerry North and ethnographic and archaeological heritage clearances have been completed, allowing final drill program design and planning for the Company’s maiden RC drill program to commence in H2 2023.

  • Commenting on the drill program, Novo Executive Co-Chairman and Acting CEO Mike Spreadborough said, “We are very excited by the results generated from our large ongoing aircore drill program at Becher. When completing this type of program, this is the tenor and scale of results which validate our exploration team’s hypothesis of the prospectivity of Becher and support our program ahead of commencing deeper drilling. Importantly, Becher is displaying all the right geological characteristics to compare favourably to the mineralisation at the adjacent Mallina Gold Project and we are excited to be advancing our drilling program.

    “We are in the right area for major gold deposits and have a standout exploration team focused on discovering the next major gold deposit in the Pilbara. The Becher project has the potential to realise significant shareholder value within the months ahead, shaping up to be a very exciting period for the Company and our shareholders.”

    ____________________________

    1 De Grey has reported that its Hemi deposit at the Mallina Gold Project is comprised of Measured Mineral Resources of 4.7 Mt @ 1.7 g/t Au for 265 koz Au, Indicated Mineral Resources of 153.4 Mt @ 1.3 g/t Au for 6,590 koz Au, and Inferred Mineral Resources of 92.6 Mt @ 1.3 g/t Au for 3,779 koz Au, as those categories are defined in the JORC Code (as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects). Refer to De Grey’s public disclosure record for further details. No assurance can be given that a similar or any mineral resource estimate will be determined at Novo’s Becher Project.

    VANCOUVER, British Columbia, June 12, 2023 (GLOBE NEWSWIRE) -- Novo Resources Corp. (“Novo” or the “Company”) (TSX: NVO, NVO.WT & NVO.WT.A) (OTCQX: NSRPF) is pleased to report new and significant results and that it will continue the aircore (“AC”) drilling program at Becher. Results referred to in this news release are not necessarily representative of mineralisation throughout the Egina Gold Camp.

    The continued significant gold and multielement assay results from over 50,000 m drilling to date has identified multiple targets including a large priority area of anomalism across some 5 sq km at Becher and provided the Company with a high-level of confidence to continue the drilling program. Both geological setting and pathfinder multielement assays compare favourably to the adjacent Mallina Gold Project mineralisation with planning for deeper drilling underway.

    In addition, at the Nunyerry North Prospect, located in the south of the Egina Gold Camp, where a high-grade soil anomaly has previously been identified, ethnographic and archaeological heritage clearances have been completed, allowing the Company to commence final drill program design and planning for a maiden RC drill program to commence in H2 2023.

    First pass RC drilling at Bellary Dome was recently completed, testing three distinct targets at Catia, Catia East and Edney’s Find. Sporadic intervals of gold mineralisation with a peak interval of 2 m @ 2.72 g/t Au from 8 m at Catia have been returned. The project as a whole is now under review, with no further drilling planned at this time.

    BECHER PROJECT

    The Becher Project covers an area approximately 20 sq km in the north of the 100% Novo owned E47/3673 exploration tenement. The area is characterised by shallow cover overlying the highly prospective and under-explored Mallina Basin. Becher is situated adjacent to De Grey’s 10.6 Moz Au (JORC 2012)1 Mallina Gold Project and 2.5 km south of their Withnell South discovery (Figure 1).

    Novo commenced it’s 2023 aircore AC program at Becher in mid-April 2023 and to date has completed 720 holes for over 20,000 m, with over 80 holes pending assay results.



    None

    Figure 1 - Egina Gold Camp tenure showing the Becher and Nunyerry North Projects and the priority Becher prospects is available at
    globenewswire.com

    Becher Drilling Update

    The 2023 20,000 m AC program testing multiple, high-priority structural and intrusion-hosted gold targets, has been focussed at the Heckmair and Irvine Prospects following return of significant gold and pathfinder results.

    Recent drilling has returned significant intercepts (> 2 g*m in tenor) including:

  • 39 m @ 0.25 g/t Au from 81 m in F1843, including (likely drilled down dip):

  • 3 m @ 0.32 g/t Au from 81 m

  • 3 m @ 0.41 g/t Au from 108 m

  • 18 m @ 0.38 g/t Au from 21 m including 9 m @ 0.56 g/t Au from 30 m also in F1843

  • 12 m @ 0.43 g/t Au from 57 m including 6 m @ 0.66 g/t Au from 60 m also in F1843

  • 30 m @ 0.2 g/t Au from 3 m including 3 m @ 0.31 g/t Au from 6 m and 3 m @ 0.38 g/t Au from 12 m in F1924

  • 13 m @ 0.35 g/t Au from 36 m including 10 m @ 0.42 g/t Au from 39 m also in F1924

  • 9 m @ 0.39 g/t Au from 54 m including 6 m @ 0.45 g/t Au from 54 m in F1838

  • 6 m @ 0.36 g/t Au from 48 m including 3 m @ 0.6 g/t Au from 51 m in F1881

  • Refer to Tables 1 and 2 in the Appendix below for a complete list of assay results. True widths from AC drilling cannot be estimated at this time.

    Recent AC drilling has been concentrated around gold anomalies previously identified at the Irvine Prospect and impressively, continues to identify intercepts across a significant strike length. Drilling at Irvine targeted closer-spaced infill lines, as well as direct infill drilling along previously drilled lines, in order to better understand controls on structures and associated mineralisation.

    Drilling to date in 2023 has been completed predominantly at the eastern Heckmair and Irvine Prospects (Figure 2) and has now moved to the Whillans Shear.

    Results recently received confirm grade continuity at the Irvine Prospect, with continuous downhole anomalism associated with quartz veins and shearing within the sediments of the Constantine Sandstone Unit. This drilling, combined with the RC program completed in Q4 2022, indicate variations in dip direction for mineralised structures across the Irvine prospect, with holes intersecting mineralisation dipping both to the northwest and to the southeast.

    Drilling to the immediate south of the main Irvine zone also identified anomalous gold mineralisation associated with quartz veining dipping steeply and sub-vertically towards the southeast approximately 500 m southeast from the main Irvine trend (Figure 3).

    Next Steps

    Given the success of the current 20,000 m program at Becher, AC drilling will continue. The AC program will infill anomalous zones based on both gold and pathfinder geochemistry with current drilling focused on the east Whillans prospect. Following this round of drilling, the rig will then move on to complete regional reconnaissance lines across other structural corridors such as Bonatti. Several areas are under consideration for deeper RC drilling follow up in H2 2023.

    NUNYERRY NORTH DRILL UPDATE (E47/2973 - NOVO 70% / CREASY GROUP 30%)

    The Nunyerry North prospect is located within the Egina Gold Camp and approximately 80 km south of Becher (Figure 1) and is the next target that Novo is progressing as part of its Pilbara exploration program.



    Becher Project with main prospects, AC drilling progress to date and planned AC drilling over interpreted geology.
    Figure 2 - Becher Project with main prospects, AC drilling progress to date and planned AC drilling over interpreted geology is available at
    globenewswire.com



    Close up of the Heckmair-Irvine priority area with significant gold intercepts from 2022/2023 AC drilling programs, green callouts from recent results.

    Figure 3 - Close up of the Heckmair-Irvine priority area with significant gold intercepts from 2022/2023 AC drilling programs, green callouts from recent results is available at
    globenewswire.com

    Ethnographic and archeological heritage clearances have recently been completed for the Nunyerry North prospect allowing final drill program design and planning for Novo’s maiden drill program to commence in H2 2023.



    Nunyerry North high-grade shallow-dipping quartz vein-related gold mineralisation.
    Figure 4 - Nunyerry North high-grade shallow-dipping quartz vein-related gold mineralisation is available at
    globenewswire.com

    BELLARY DOME DRILLING PROGRAM RESULTS

    Commencement of a reverse circulation (“RC”) drill program focussed on the orogenic gold target at the Catia Prospect (“Catia”) and gold in conglomerate at the Edney’s Find Prospect (“Edney’s Find”) at the Bellary Dome Project (“Bellary”), South Pilbara, Western Australia, was announced in early 20232.

    This drilling was recently completed, testing three distinct targets at Catia, Catia East and Edney’s Find:

  • 20 holes for 1,768 m were drilled at the Catia main prospect where high-grade gold results were returned from rock chip sampling of shear-related quartz vein swarms in 2021, including peak results of 556 ppm gold and 117 ppm gold.

  • 8 holes for 616 m were drilled at Catia East, where soil sampling completed in 2021 by Novo highlighted a significant soil anomaly 700 m east-southeast of Catia.

  • 6 holes for 312 m were drilled at the Edney’s Find Conglomerate target where peak gold values from trench rock chip samples in 2020 returned 36.4 ppm Au and numerous nuggets were located at surface by previous explorers.

  • Refer to Tables 3 and 4 in the Appendix below for a complete list of assay results. Drilling was based on detailed mapping and targeted to be perpendicular to mineralisation as much as practical. In some areas, the geology is complex and due to the exploratory nature of the work, the true width of mineralisation cannot yet be precisely determined.

    Several zones of quartz veins were intersected in most drill holes, however peak assay results (using 0.3 g/t Au cut-off) of 2 m @ 2.72 g/t Au from 8 m (BC002) and 1 m @ 1.29 g/t Au from 12 m (BC003) were returned from Catia and no anomalous gold was intersected at Catia East. It is interpreted that the high-grade shallow dipping quartz vein-related gold mineralisation at Catia is restricted to the near surface along the main Catia Shear, with erratic gold distribution. Vein sets at depth and the steep NNE dipping Catia Shear Zone appear to be un-mineralised.

    Drilling at Edney’s Find intersected channelised conglomerate with up to 5% sulphide, on a major unconformity overlying basement rocks. The conglomerate channel is interpreted to be up to 100 m wide and trends WNW with zones of significant “buckshot” (round) pyrite. A peak result of 1 m @ 2.3 g/t Au was returned from the basal conglomerate contact. The Edney’s Find target is open to the W and SW.

    Only sporadic intervals of gold mineralisation have been returned during the RC drill program at Bellary Dome. The project as a whole is now under review, with no further drilling planned at this time.

    _________________________

    2 Refer to the Company’s news release dated March 22, 2023.

    ANALYTICAL METHODOLOGY

    Analytical methodology – Becher AC Drilling

    AC drilling is utilised as a first pass technique testing for gold mineralisation and anomalous pathfinder geochemistry in basement rocks under cover. The drilling methodology is rapid and low cost, with a low impact footprint, enabling large systematic programs to be completed in a cost effective and timely manner.

    One metre AC drill samples are collected from the drill rig through a cyclone and placed on the ground in piles for geological quantitative and qualitative logging. These piles are then speared as three-meter composites into a 500-gram ChrysosTM PhotonAssay jar. Some of the end of hole intervals are shorter than three meters depending on final hole depths. Jars are dispatched weekly to Intertek Genalysis (“Intertek”) in Perth, Western Australia and analysed for gold using ChrysosTM PhotonAssay (PHXR/AU01).

    QAQC procedures for the program include insertion of a certified blank approximately every 25 samples (4 per hundred), a ChrysosTM PhotonAssay certified standard approximately every 50 samples (2 per 100) and duplicate sampling (split of 3 m composite) at the rate of 4 per hundred. In addition, Intertek inserts ChrysosTM PhotonAssay certified standards at the rate of 2 per hundred.

    Analytical methodology – Bellary Dome RC Drilling

    RC drilling allows for deeper testing of anomalies delineated by aircore drilling, and other geological direct targeting methods such as surface mapping and sampling, where bedrock is exposed at surface.

    RC drilling was sampled as either 4 m composite samples using a spear, or if visual parameters such as percentage of quartz veins or sulphide mineralisation or alteration intensity were deemed to warrant, as 1 m cone splits directly off the drill rig.

    All RC chip samples were sent to Intertek in Perth, Western Australia and were crushed and pulverised and assayed for Au by four acid digest and 50 g charge fire assay FA50/MS. QAQC protocols included insertion of a certified blank approximately every 25 samples (4 per hundred, 2 of which are 500 g coarse black CRMS and two of which are 60 g pulverised -80# CRMs), certified standards for Au approximately every 25 samples and duplicate sampling (split of 4 m composite) at the rate of 4 per hundred.

    Multi-elements were assayed using a handheld pXRF on -0.9mm powder collected from the sieved chips every 1m. The pXRF assay technique utilised a Niton XL5 handheld XRF machine calibrated daily, with 4 QAQC standards (fit for purpose including certified As, Cu and Sb values) run concurrently, with an additional 2 standards checked per 100 readings and 4 QAQC standard assayed before the machine is shut down. Drill powders are point analysed for 90 seconds using 4 machine filters.

    There were no limitations to the verification process and all relevant data was verified by a qualified person as defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects (“NI 43-101”) by reviewing analytical procedures undertaken by Intertek.

    QP STATEMENT

    Mr. Iain Groves (MAIG), is the qualified person, as defined under NI 43-101, responsible for, and having reviewed and approved the technical information contained in this news release other than information concerning De Grey’s Mallina Gold Project. Mr. Groves is Novo’s Exploration Manger – West Pilbara.

    ABOUT NOVO

    Novo explores and develops its prospective land package covering approximately 10,500 square kilometres in the Pilbara region of Western Australia, along with the 22 square kilometre Belltopper Project in the Bendigo Tectonic Zone of Victoria, Australia. In addition to the Company’s primary focus, Novo seeks to leverage its internal geological expertise to deliver value-accretive opportunities to its stakeholders.

    For more information, please contact Michael Spreadborough at +61-419-329-687 or mike.spreadborough@novoresources.com, or Leo Karabelas at +1-416-543-3120 or leo@novoresources.com.

    On Behalf of the Board of Directors,

    Novo Resources Corp.

    Michael Spreadborough

    Michael Spreadborough

    Executive Co-Chairman and Acting CEO

    Forward-looking information

    Some statements in this news release contain forward-looking information (within the meaning of Canadian securities legislation) including, without limitation, that the Company’s maiden RC drill program at Nunyerry North will commence in H2 2023, that several areas in the Egina Gold Camp are under consideration for deeper RC drilling in H2 2023, and that the Bellary Dome project is now under review. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include, without limitation, customary risks of the resource industry and the risk factors identified in Novo’s annual information form for the year ended December 31, 2022, which is available under Novo’s profile on SEDAR at www.sedar.com. Forward-looking statements speak only as of the date those statements are made. Except as required by applicable law, Novo assumes no obligation to update or to publicly announce the results of any change to any forward-looking statement contained or incorporated by reference herein to reflect actual results, future events or developments, changes in assumptions or changes in other factors affecting the forward-looking statements. If Novo updates any forward-looking statement(s), no inference should be drawn that the Company will make additional updates with respect to those or other forward-looking statements.

    APPENDIX

    Table 1 Becher Project - Aircore drill hole locations in MGA_94 zone 50

    HOLE_ID

    Easting (m)

    Northing (m)

    RL (m)

    Azimuth

    Dip

    Depth

    F1763

    621350

    7684518

    59.9

    147

    -60

    24

    F1764

    621336

    7684539

    60.0

    147

    -60

    24

    F1765

    621323

    7684560

    59.9

    147

    -60

    28

    F1766

    621309

    7684581

    59.8

    147

    -60

    30

    F1767

    621295

    7684602

    59.6

    147

    -60

    30

    F1768

    621281

    7684623

    59.6

    147

    -60

    42

    F1769

    621268

    7684643

    59.4

    147

    -60

    30

    F1770

    621254

    7684664

    59.3

    147

    -60

    24

    F1771

    621240

    7684685

    59.3

    147

    -60

    30

    F1772

    621227

    7684706

    59.2

    147

    -60

    24

    F1773

    621213

    7684727

    59.2

    147

    -60

    30

    F1774

    621199

    7684748

    59.1

    147

    -60

    24

    F1775

    617841

    7684485

    59.5

    180

    -60

    24

    F1776

    617841

    7684510

    59.3

    180

    -60

    24

    F1777

    617841

    7684535

    59.1

    180

    -60

    7

    F1778

    617841

    7684560

    59.0

    180

    -60

    9

    F1779

    617841

    7684585

    58.9

    180

    -60

    9

    F1780

    617841

    7684610

    58.7

    180

    -60

    7

    F1781

    617841

    7684635

    58.6

    180

    -60

    7

    F1782

    617841

    7684660

    58.4

    180

    -60

    12

    F1783

    617841

    7684685

    58.4

    180

    -60

    7

    F1784

    617841

    7684710

    58.3

    180

    -60

    7

    F1785

    617841

    7684735

    58.2

    180

    -60

    7

    F1786

    617841

    7684760

    58.1

    180

    -60

    7

    F1787

    617841

    7684785

    58.0

    180

    -60

    7

    F1788

    617841

    7684810

    57.9

    180

    -60

    9.3

    F1789

    617841

    7684835

    57.9

    180

    -60

    7

    F1790

    617841

    7684860

    57.8

    180

    -60

    7

    F1791

    617841

    7684885

    57.8

    180

    -60

    11

    F1792

    617841

    7684910

    57.8

    180

    -60

    7

    F1793

    617841

    7684935

    57.8

    180

    -60

    11

    F1794

    617841

    7684960

    57.7

    180

    -60

    7

    F1795

    617841

    7684985

    57.8

    180

    -60

    7

    F1796

    617841

    7685010

    57.7

    180

    -60

    7

    F1797

    617841

    7685035

    57.8

    180

    -60

    17

    F1798

    617841

    7685060

    57.8

    180

    -60

    13

    F1799

    617841

    7685085

    57.6

    180

    -60

    13

    F1800

    617841

    7685110

    57.6

    180

    -60

    24

    F1801

    617841

    7685135

    57.6

    180

    -60

    25

    F1802

    617841

    7685160

    57.6

    180

    -60

    8

    F1803

    617841

    7685185

    57.6

    180

    -60

    11

    F1804

    617841

    7685210

    57.5

    180

    -60

    13

    F1805

    617841

    7685235

    57.5

    180

    -60

    13

    F1806

    617841

    7685260

    57.6

    180

    -60

    19

    F1807

    617841

    7685285

    57.6

    180

    -60

    17

    F1808

    617841

    7685310

    57.5

    180

    -60

    25

    F1809

    617841

    7685335

    57.4

    180

    -60

    19

    F1810

    617841

    7685360

    57.3

    180

    -60

    31

    F1811

    617841

    7685385

    57.2

    180

    -60

    29

    F1812

    617841

    7685410

    57.2

    180

    -60

    25

    F1813

    617841

    7685435

    57.2

    180

    -60

    17

    F1814

    617841

    7685460

    57.2

    180

    -60

    22

    F1815

    617841

    7685485

    57.2

    180

    -60

    13

    F1816

    617841

    7685510

    57.2

    180

    -60

    13

    F1817

    617841

    7685535

    57.1

    180

    -60

    19

    F1818

    617841

    7685560

    57.1

    180

    -60

    15

    F1819

    617841

    7685585

    57.1

    180

    -60

    37

    F1820

    617841

    7685610

    57.1

    180

    -60

    13

    F1821

    617841

    7685635

    57.2

    180

    -60

    13

    F1822

    617841

    7685660

    57.2

    180

    -60

    19

    F1823

    617841

    7685685

    57.1

    180

    -60

    13

    F1824

    617841

    7685710

    57.3

    180

    -60

    19

    F1825

    617841

    7685735

    57.6

    180

    -60

    19

    F1826

    617841

    7685760

    57.4

    180

    -60

    25

    F1827

    617841

    7685785

    57.4

    180

    -60

    27

    F1828

    617841

    7685810

    57.3

    180

    -60

    19

    F1829

    618481

    7684660

    57.4

    180

    -60

    12

    F1830

    618481

    7684685

    57.4

    180

    -60

    10

    F1831

    618481

    7684710

    57.5

    180

    -60

    31

    F1832

    618481

    7684735

    57.4

    180

    -60

    19

    F1833

    618481

    7684760

    57.3

    180

    -60

    27

    F1834

    618481

    7684785

    57.2

    180

    -60

    24

    F1835

    618481

    7684810

    57.0

    180

    -60

    19

    F1836

    618481

    7684835

    57.0

    180

    -60

    15

    F1837

    618481

    7684860

    57.0

    180

    -60

    19

    F1838

    621112

    7684292

    65.0

    331

    -60

    97

    F1839

    621181

    7684185

    64.6

    326

    -60

    91

    F1840

    620696

    7684345

    69.8

    326

    -60

    97

    F1841

    620721

    7684318

    70.8

    325

    -60

    103

    F1842

    620736

    7684289

    69.1

    326

    -60

    73

    F1843

    620754

    7684257

    69.2

    329

    -60

    127

    F1844

    620782

    7684212

    67.4

    327

    -60

    73

    F1845

    620800

    7684190

    67.0

    325

    -60

    91

    F1846

    620802

    7683597

    60.3

    326

    -60

    127

    F1847

    620750

    7683616

    60.3

    55

    -60

    97

    F1848

    620729

    7683602

    60.2

    55

    -60

    91

    F1849

    620708

    7683588

    60.2

    59

    -60

    97

    F1850

    620687

    7683575

    60.1

    58

    -60

    97

    F1851

    620666

    7683561

    60.2

    57

    -60

    97

    F1852

    620913

    7684309

    70.1

    327

    -60

    42

    F1853

    620926

    7684288

    67.9

    327

    -60

    36

    F1854

    620940

    7684267

    66.3

    327

    -60

    15

    F1855

    620954

    7684246

    65.5

    327

    -60

    30

    F1856

    620968

    7684225

    65.1

    327

    -60

    30

    F1857

    620981

    7684204

    64.7

    327

    -60

    39

    F1858

    620995

    7684183

    64.6

    327

    -60

    41

    F1859

    621009

    7684162

    64.4

    327

    -60

    42

    F1860

    621202

    7684449

    61.2

    327

    -60

    36

    F1861

    621216

    7684428

    61.3

    327

    -60

    24

    F1862

    621230

    7684407

    61.4

    327

    -60

    31

    F1863

    621243

    7684386

    61.5

    327

    -60

    42

    F1864

    621258

    7684365

    61.6

    327

    -60

    24

    F1865

    621271

    7684344

    61.8

    327

    -60

    30

    F1866

    621284

    7684323

    62.7

    327

    -60

    30

    F1867

    621348

    7684335

    61.6

    327

    -60

    42

    F1868

    621362

    7684314

    61.8

    327

    -60

    42

    F1869

    621376

    7684292

    62.2

    327

    -60

    36

    F1870

    620762

    7683953

    61.8

    327

    -60

    20

    F1871

    620776

    7683932

    61.5

    327

    -60

    19

    F1872

    620789

    7683911

    61.4

    327

    -60

    25

    F1873

    620803

    7683890

    61.2

    327

    -60

    26

    F1874

    620817

    7683869

    61.0

    327

    -60

    34

    F1875

    620831

    7683848

    60.9

    327

    -60

    26

    F1876

    620844

    7683827

    60.7

    327

    -60

    24

    F1877

    620858

    7683806

    60.6

    327

    -60

    36

    F1878

    620872

    7683785

    60.5

    327

    -60

    60

    F1879

    620885

    7683764

    60.5

    327

    -60

    61

    F1880

    620899

    7683743

    60.5

    327

    -60

    60

    F1881

    620913

    7683723

    60.5

    327

    -60

    60

    F1882

    620926

    7683702

    60.5

    327

    -60

    61

    F1883

    620940

    7683681

    60.5

    327

    -60

    82

    F1884

    620453

    7683840

    59.8

    327

    -60

    16

    F1885

    620467

    7683819

    59.8

    327

    -60

    15

    F1886

    620481

    7683798

    59.8

    327

    -60

    29

    F1887

    620494

    7683777

    59.7

    327

    -60

    24

    F1888

    620508

    7683756

    59.8

    327

    -60

    25

    F1889

    620522

    7683735

    59.7

    327

    -60

    25

    F1890

    620535

    7683714

    59.8

    327

    -60

    24

    F1891

    620549

    7683694

    60.0

    327

    -60

    19

    F1892

    620563

    7683673

    60.0

    327

    -60

    25

    F1893

    620577

    7683652

    60.0

    327

    -60

    24

    F1894

    620590

    7683631

    60.0

    327

    -60

    17

    F1895

    620604

    7683610

    60.0

    327

    -60

    19

    F1896

    620618

    7683589

    60.1

    327

    -60

    36

    F1897

    620631

    7683568

    60.1

    327

    -60

    36

    F1898

    620645

    7683547

    60.2

    327

    -60

    13

    F1899

    620659

    7683526

    60.3

    327

    -60

    13

    F1900

    620673

    7683505

    60.3

    327

    -60

    25

    F1901

    620278

    7683815

    59.6

    327

    -60

    10

    F1902

    620292

    7683794

    59.6

    327

    -60

    9

    F1903

    620306

    7683773

    59.6

    327

    -60

    13

    F1904

    620319

    7683752

    59.6

    327

    -60

    7

    F1905

    620333

    7683731

    59.6

    327

    -60

    12

    F1906

    620347

    7683710

    59.5

    327

    -60

    10

    F1907

    620361

    7683689

    59.7

    327

    -60

    17

    F1908

    620374

    7683669

    59.7

    327

    -60

    21

    F1909

    620388

    7683648

    59.7

    327

    -60

    19

    F1910

    620402

    7683627

    59.7

    327

    -60

    29

    F1911

    620415

    7683606

    59.7

    327

    -60

    28

    F1912

    620429

    7683585

    59.7

    327

    -60

    19

    F1913

    620443

    7683564

    59.9

    327

    -60

    19

    F1914

    620456

    7683543

    59.9

    327

    -60

    25

    F1915

    620470

    7683522

    59.9

    327

    -60

    19

    F1916

    620484

    7683501

    60.0

    327

    -60

    31

    F1917

    620498

    7683480

    60.0

    327

    -60

    24

    F1918

    620511

    7683459

    60.1

    327

    -60

    30

    F1919

    620525

    7683439

    60.3

    327

    -60

    25

    F1920

    620539

    7683418

    60.4

    327

    -60

    19

    F1921

    620552

    7683397

    60.8

    327

    -60

    19

    F1922

    620566

    7683376

    60.8

    327

    -60

    19

    F1923

    620580

    7683355

    60.8

    327

    -60

    25

    F1924

    620120

    7684057

    58.9

    327

    -60

    49

    F1925

    620134

    7684036

    59.0

    327

    -60

    49

    F1926

    620147

    7684015

    59.1

    327

    -60

    55

    F1927

    620162

    7683995

    59.3

    327

    -60

    49

    F1928

    620175

    7683974

    59.5

    327

    -60

    55

    F1929

    620188

    7683953

    59.5

    327

    -60

    49

    F1930

    620202

    7683932

    59.6

    327

    -60

    49

    F1931

    618481

    7684635

    57.4

    180

    -60

    11

    F1932

    618481

    7684885

    56.9

    180

    -60

    22

    F1933

    618481

    7684910

    57.0

    180

    -60

    23

    F1934

    618481

    7684935

    56.9

    180

    -60

    23

    F1935

    618481

    7684960

    56.9

    180

    -60

    23

    F1936

    618481

    7684985

    56.9

    180

    -60

    24

    F1937

    618481

    7685010

    56.9

    180

    -60

    19

    F1938

    618481

    7685035

    57.0

    180

    -60

    18

    F1939

    618481

    7685060

    56.9

    180

    -60

    17

    F1940

    618481

    7685085

    56.9

    180

    -60

    19

    F1941

    618481

    7685110

    57.0

    180

    -60

    19

    F1942

    618481

    7685135

    56.9

    180

    -60

    25

    F1943

    618481

    7685160

    57.0

    180

    -60

    19

    F1944

    618481

    7685185

    56.9

    180

    -60

    25

    F1945

    618481

    7685210

    56.7

    180

    -60

    25

    F1946

    618481

    7685235

    56.7

    180

    -60

    24

    F1947

    618481

    7685260

    56.7

    180

    -60

    20

    F1948

    618481

    7685285

    56.7

    180

    -60

    24

    F1949

    618481

    7685310

    56.7

    180

    -60

    24

    F1950

    618481

    7685335

    56.8

    180

    -60

    24

    F1951

    618481

    7685360

    56.6

    180

    -60

    24

    F1952

    618481

    7685385

    56.6

    180

    -60

    24

    F1953

    618481

    7685410

    56.5

    180

    -60

    24

    F1954

    618481

    7685435

    56.6

    180

    -60

    24

    F1955

    618470

    7684622

    57.4

    90

    -60

    19

    F1956

    618445

    7684622

    57.5

    90

    -60

    19

    F1957

    618420

    7684621

    57.6

    90

    -60

    13

    F1958

    618395

    7684620

    57.5

    90

    -60

    13

    F1959

    618370

    7684618

    57.6

    90

    -60

    13

    F1960

    618345

    7684616

    57.7

    90

    -60

    15

    F1961

    618320

    7684613

    57.8

    90

    -60

    13

    F1962

    618295

    7684610

    58.0

    90

    -60

    36

    F1963

    618270

    7684610

    58.1

    90

    -60

    24

    F1964

    618245

    7684608

    58.3

    90

    -60

    19

    F1965

    618220

    7684607

    58.6

    90

    -60

    19

    F1966

    618195

    7684608

    58.6

    90

    -60

    19

    F1967

    618145

    7684610

    58.7

    90

    -60

    24

    F1968

    618120

    7684613

    58.8

    90

    -60

    16

    F1969

    618095

    7684619

    58.6

    90

    -60

    13

    F1970

    618070

    7684621

    58.7

    90

    -60

    13

    F1971

    618045

    7684612

    58.7

    90

    -60

    19

    F1972

    618020

    7684611

    58.6

    90

    -60

    10

    F1973

    617995

    7684614

    58.5

    90

    -60

    13

    F1974

    617970

    7684615

    58.5

    90

    -60

    11

    F1975

    617945

    7684614

    58.5

    90

    -60

    7

    F1976

    617920

    7684613

    58.6

    90

    -60

    11

    F1977

    617895

    7684609

    58.6

    90

    -60

    13

    F1978

    617870

    7684606

    58.6

    90

    -60

    13

    F1979

    617820

    7684600

    58.9

    90

    -60

    13

    F1980

    617795

    7684599

    59.1

    90

    -60

    19

    F1981

    617770

    7684601

    59.5

    90

    -60

    13

    F1982

    617745

    7684606

    59.9

    90

    -60

    13

    F1983

    617720

    7684611

    60.3

    90

    -60

    19

    F1984

    617695

    7684612

    61.2

    90

    -60

    30

    F1985

    617670

    7684609

    61.5

    90

    -60

    18

    F1986

    617645

    7684606

    59.6

    90

    -60

    24

    F1987

    617620

    7684602

    58.9

    90

    -60

    23

    F1988

    617595

    7684600

    58.9

    90

    -60

    22

    F1989

    617570

    7684599

    58.8

    90

    -60

    24

    F1990

    617545

    7684598

    58.8

    90

    -60

    28

    F1991

    617521

    7684498

    58.9

    180

    -60

    55

    F1992

    617521

    7684523

    58.9

    180

    -60

    67

    F1993

    617495

    7684610

    58.8

    90

    -60

    24

    F1994

    617470

    7684610

    58.9

    90

    -60

    24

    F1995

    617445

    7684610

    58.9

    90

    -60

    24

    F1996

    617420

    7684610

    59.0

    90

    -60

    24

    F1997

    617395

    7684610

    59.1

    90

    -60

    24

    F1998

    617370

    7684610

    59.3

    90

    -60

    24

    F1999

    617345

    7684610

    59.5

    90

    -60

    24

    F2000

    617489

    7685185

    58.2

    90

    -60

    24

    F2001

    617464

    7685185

    58.2

    90

    -60

    37

    F2002

    617439

    7685185

    58.4

    90

    -60

    37

    F2003

    617414

    7685185

    58.8

    90

    -60

    31

    F2004

    617389

    7685185

    59.0

    90

    -60

    25

    F2005

    617364

    7685185

    59.4

    90

    -60

    24

    F2006

    617339

    7685185

    59.1

    90

    -60

    25

    F2007

    617314

    7685185

    58.9

    90

    -60

    25

    F2008

    617289

    7685185

    58.8

    90

    -60

    25

    F2009

    617264

    7685185

    58.8

    90

    -60

    25

    F2010

    617239

    7685184

    58.9

    90

    -60

    24

    F2011

    617201

    7684885

    59.1

    180

    -60

    24

    F2012

    617201

    7684910

    59.1

    180

    -60

    24

    F2013

    617201

    7684935

    59.1

    180

    -60

    24

    F2014

    617201

    7684960

    59.0

    180

    -60

    30

    F2015

    617201

    7684985

    59.0

    180

    -60

    30

    F2016

    617201

    7685010

    58.9

    180

    -60

    36

    F2017

    617201

    7685035

    59.0

    180

    -60

    24

    F2018

    617201

    7685060

    58.9

    180

    -60

    30

    F2019

    617201

    7685085

    58.9

    180

    -60

    31

    F2020

    617201

    7685110

    58.9

    180

    -60

    24

    F2021

    617201

    7685135

    58.9

    180

    -60

    24

    F2022

    617201

    7685160

    58.8

    180

    -60

    30

    F2023

    617201

    7685185

    58.8

    180

    -60

    24

    F2024

    617201

    7685210

    58.8

    180

    -60

    24

    F2025

    617201

    7685235

    58.8

    180

    -60

    31

    F2026

    617201

    7685260

    58.8

    180

    -60

    25

    F2027

    617201

    7685285

    58.9

    180

    -60

    24

    F2028

    617201

    7685310

    59.0

    180

    -60

    24

    F2029

    617201

    7685335

    59.1

    180

    -60

    24

    F2030

    617201

    7685360

    59.2

    180

    -60

    25

    F2031

    621898

    7684847

    58.8

    327

    -60

    49

    F2032

    621912

    7684826

    58.6

    327

    -60

    55

    F2033

    621925

    7684805

    58.7

    327

    -60

    49

    F2034

    621939

    7684784

    58.7

    327

    -60

    49

    F2035

    621953

    7684763

    58.8

    327

    -60

    55

    F2036

    621966

    7684742

    59.1

    327

    -60

    49

    F2037

    621980

    7684721

    59.1

    327

    -60

    49

    F2038

    621994

    7684700

    59.2

    327

    -60

    49

    F2039

    622008

    7684679

    58.8

    327

    -60

    49

    F2040

    622021

    7684659

    58.7

    327

    -60

    55

    F2041

    621651

    7685223

    58.5

    147

    -60

    24

    F2042

    621638

    7685244

    58.4

    147

    -60

    25

    F2043

    621624

    7685265

    58.4

    147

    -60

    13

    F2044

    621610

    7685285

    58.4

    147

    -60

    19

    F2045

    621596

    7685306

    58.4

    147

    -60

    19

    F2046

    621583

    7685327

    58.3

    147

    -60

    19

    F2047

    621570

    7685354

    58.3

    147

    -60

    31

    F2048

    621556

    7685375

    58.5

    147

    -60

    25

    F2049

    621543

    7685396

    58.6

    147

    -60

    19

    F2050

    621529

    7685417

    59.1

    147

    -60

    25

    F2051

    621516

    7685438

    59.3

    147

    -60

    31

    F2052

    621503

    7685459

    59.8

    147

    -60

    25

    F2053

    621489

    7685480

    60.2

    147

    -60

    25

    F2054

    621476

    7685502

    59.9

    147

    -60

    25

    F2055

    621462

    7685523

    59.5

    147

    -60

    25

    F2056

    621449

    7685544

    59.6

    147

    -60

    25

    F2057

    621436

    7685565

    60.0

    147

    -60

    25

    F2058

    621422

    7685586

    60.2

    147

    -60

    25

    F2059

    621409

    7685607

    60.3

    147

    -60

    25


    Table 2 Becher Project – Aircore drilling intercepts >0.1 g/t Au with up to 2 m internal dilution

    HOLE_ID

    From (m)

    To (m)

    Interval (m)

    Au (g/t)

    F1818

    9

    12

    3

    0.12

    F1825

    3

    6

    3

    0.12

    F1838

    27

    30

    3

    0.10

    F1838

    54

    63

    9

    0.39

    F1838

    72

    75

    3

    0.12

    F1840

    90

    93

    3

    0.10

    F1841

    90

    103

    13

    0.15

    F1842

    48

    51

    3

    0.22

    F1842

    63

    72

    9

    0.13

    F1843

    3

    6

    3

    0.11

    F1843

    15

    18

    3

    0.31

    F1843

    21

    39

    18

    0.38

    F1843

    42

    45

    3

    0.20

    F1843

    57

    69

    12

    0.43

    F1843

    72

    78

    6

    0.25

    F1843

    81

    120

    39

    0.25

    F1844

    6

    9

    3

    0.27

    F1844

    12

    15

    3

    0.16

    F1844

    27

    30

    3

    0.11

    F1844

    48

    54

    6

    0.28

    F1845

    39

    48

    9

    0.21

    F1845

    57

    60

    3

    0.11

    F1852

    27

    30

    3

    0.23

    F1852

    33

    36

    3

    0.11

    F1854

    6

    15

    9

    0.15

    F1855

    18

    21

    3

    0.12

    F1856

    15

    21

    6

    0.18

    F1871

    12

    15

    3

    0.20

    F1879

    15

    18

    3

    0.12

    F1880

    12

    18

    6

    0.17

    F1880

    21

    27

    6

    0.23

    F1881

    48

    54

    6

    0.36

    F1882

    9

    12

    3

    0.29

    F1893

    18

    21

    3

    0.16

    F1900

    18

    24

    6

    0.17

    F1924

    3

    33

    30

    0.20

    F1924

    36

    49

    13

    0.35

    F1926

    39

    45

    6

    0.22

    F1928

    51

    55

    4

    0.15

    F1936

    3

    9

    6

    0.15

    F1936

    12

    15

    3

    0.2

    F1937

    9

    12

    3

    0.11

    F1995

    0

    3

    3

    0.13

    F2036

    3

    6

    3

    0.17

    F2046

    18

    19

    1

    0.15

    F2047

    30

    31

    1

    0.13


    Table 3 – RC drill hole locations Bellary Dome Project in MGA_2020 zone 50

    Hole ID

    Prospect

    Easting (m)

    Northing (m)

    RL (m)

    Dip

    Azimuth

    DEPTH (m)

    BC001

    CATIA

    563523.0

    7439158.7

    422

    -50

    359

    102

    BC002

    CATIA

    563480.2

    7439219.2

    430

    -53

    352

    84

    BC003

    CATIA

    563479.0

    7439199.0

    432

    -55

    352

    84

    BC004

    CATIA

    563477.4

    7439177.1

    432

    -55

    360

    120

    BC005

    CATIA

    563443.4

    7439213.0

    436

    -50

    3

    84

    BC006

    CATIA

    563439.5

    7439197.6

    439

    -54

    357

    114

    BC007

    CATIA

    563403.9

    7439232.8

    436

    -54

    360

    102

    BC008

    CATIA

    563433.7

    7439278.4

    426

    -90

    160

    30

    BC009

    CATIA

    563433.9

    7439279.0

    426

    -83

    20

    120

    BC010

    CATIA

    563440.7

    7439276.5

    426

    -63

    178

    96

    BC011

    CATIA

    563443.2

    7439285.2

    424

    -65

    357

    102

    BC012

    CATIA

    563324.9

    7439279.9

    425

    -55

    33

    90

    BC013

    CATIA

    563367.4

    7439350.4

    419

    -54

    33

    71

    BC014

    CATIA

    563484.6

    7439263.7

    423

    -65

    348

    102

    BC015

    CATIA

    563521.0

    7439254.0

    420

    -45

    184

    120

    BC016

    CATIA

    563560.0

    7439198.7

    417

    -50

    185

    82

    BC017

    CATIA

    563559.6

    7439141.3

    416

    -50

    0

    86

    BC018

    CATIA E

    563670.3

    7439083.6

    411

    -55

    209

    78

    BC019

    CATIA E

    563702.9

    7439131.1

    412

    -55

    51

    17

    BC020

    CATIA E

    563696.3

    7439130.6

    412

    -54

    205

    84

    BC021

    CATIA E

    564095.0

    7438995.3

    413

    -58

    37

    96

    BC022

    CATIA E

    564067.4

    7438959.1

    412

    -60

    33

    78

    BC023

    CATIA E

    564044.9

    7438923.9

    412

    -60

    44

    72

    BC024

    CATIA E

    564016.1

    7438881.8

    411

    -54

    206

    78

    BC025

    CATIA E

    563932.5

    7439026.9

    413

    -55

    42

    72

    BC026

    CATIA E

    563879.6

    7438958.3

    411

    -55

    207

    54

    BC027

    CATIA E

    563896.8

    7438989.0

    411

    -55

    205

    78

    BC028

    EDNEYS

    566167.8

    7437931.6

    402

    -55

    35

    40

    BC029

    EDNEYS

    566224.2

    7437895.7

    402

    -55

    25

    46

    BC030

    EDNEYS

    566213.0

    7437880.5

    401

    -55

    35

    52

    BC031

    EDNEYS

    566287.5

    7437845.7

    402

    -55

    35

    58

    BC032

    EDNEYS

    566267.0

    7437810.4

    400

    -55

    35

    58

    BC033

    EDNEYS

    566316.2

    7437757.9

    399

    -55

    60

    58

    BC034

    CATIA E

    564099.3

    7439006.7

    414

    -60

    213

    88


    Table 4 – Bellary Dome Project – RC drilling intercepts > 0.1 g/t Au Bellary Dome Project

    Hole ID

    Prospect

    From (m)

    Interval (m)

    Au g/t

    Intercept

    BC002

    Catia

    2

    1

    0.202

    1 m @ 0.20 g/t Au

    BC002

    Catia

    7

    1

    0.867

    2 m at 2.72 g/t Au

    BC002

    Catia

    8

    1

    4.569

    BC002

    Catia

    24

    1

    0.159

    1 m @ 0.16 g/t Au

    BC003

    Catia

    0

    1

    0.393

    1 m @ 0.39 g/t Au

    BC003

    Catia

    12

    1

    1.289

    1 m @ 1.29 g/t Au

    BC005

    Catia

    4

    1

    0.136

    3 m @ 0.21 g/t Au

    BC005

    Catia

    5

    1

    0.313

    BC005

    Catia

    6

    1

    0.174

    BC008

    Catia

    6

    1

    1.845

    1 m @ 1.85 g/t Au

    BC014

    Catia

    3

    1

    0.147

    1 m @ 0.15 g/t Au

    BC014

    Catia

    60

    1

    0.132

    1 m @ 0.13 g/t Au

    BC015

    Catia

    22

    1

    0.622

    3 m @ 0.29 g/t Au

    BC015

    Catia

    23

    1

    0.05

    BC015

    Catia

    24

    1

    0.19

    BC029

    Edney's

    3

    1

    0.285

    2 m @ 0.28 g/t Au

    BC029

    Edney's

    4

    1

    0.271

    BC029

    Edney's

    37

    1

    0.15

    3 m @ 0.96 g/t Au

    BC029

    Edney's

    38

    1

    0.438

    BC029

    Edney's

    39

    1

    2.3

    BC030

    Edney's

    20

    4

    0.131

    4 m @ 0.13 g/t Au

    BC030

    Edney's

    32

    4

    0.101

    4 m @ 0.10 g/t Au

    BC031

    Edney's

    0

    4

    0.107

    4 m @ 0.11 g/t Au



    Report TOU ViolationShare This Post
     Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext