SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Gold and Silver Juniors, Mid-tiers and Producers

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: John McCarthy8/9/2006 1:58:46 AM
   of 78416
 
This is another one on that potential takeover target
list.

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>
Kimber drills 18 metres of 17.7 g/t Au eq. at Carmen
Kimber Resources Inc. (AMEX:KBX, TSX:KBR)

VANCOUVER, Aug. 8 /CNW/ - Kimber is pleased to report further drill results from both the Carmen and Carotare deposits.

Carmen Deposit

Drilling on the Carmen deposit focused on drilling infill holes to close gaps, and step-out holes to test the limits of the deposit.

The most notable hole, MTR-363 returned 18 metres of 17.70 g/t gold equivalent including 4.0 metres of 70.67 g/t gold equivalent.

This hole was targeting part of the Los Hilos structure located on the eastern part of Carmen, where there is an area of about 100 metres across with little drilling.

This area has been followed up with MTR-384 (results pending), up dip from MTR-363, and will likely see further drilling if results continue to show intercepts of economic interest.

MTR-365 located in an area between Carmen and Cocos returned a 44 metre interval of 2.29 g/t gold equivalent.

MTR-373, positioned in the northern part of the Carmen was a step-out to continue testing the limits of the deposit. It
intersected 6.0 metres of 5.41 g/t gold equivalent and 14 metres of 3.56 g/t gold equivalent and will be followed up with further step-outs in the same direction.

MTR-367, 368, 370 and 371, also targeted to test the limits of the deposit, all reported scattered anomalous or scattered low grade. A few holes still to be drilled will continue to test the limits of the deposit

The portions of the deposit likely to be included in an initial pit are now well defined. There will be a minimal number of holes drilled in a few zones where drill spacing needs to be tighter.

Carotare Deposit

Results from Carotare include two core holes (CTC) and one reverse circulation hole (CTR) all from Carotare East.

Most notable was CTC-04 which returned 14.95 metres of 6.10 g/t gold equivalent including an interval of 2.95 metres of 16.10 g/t gold equivalent. This is a step out from CTR-10 (reported June 22, 2005) and from CTC-01 (reported March 2, 2006).

To view the location of the drill results below in relation to the deposits, please utilize the Google Earth feature of our website at: kimberresources.com.

cnw.ca
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext