SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : lake shore
LSG 1.4690.0%Apr 11 5:00 PM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Detective who wrote (1)1/6/2012 10:51:32 AM
From: tyc:>  Read Replies (2) of 16
 
How do you explain the problems ?

I note the following from the 2007 pre-feasibility study:

"..... The resources for the TW Project however, have been carefully and prudently established from significant surface drilling which limits the the potential downside risk that the ore grades encountered during the mine life could differ from those estimated to date...."

Oh yeah ? What about " Drill for structure, drift for grade" ? It goes on... "The bulk-sampling program will determine the grade more accurately...". But I think this is so only if it looks for trouble,...... not if it looks for confirmation of high grade..

I believe the higher grades are still there for the future.

(In contrast the 43-101 of Thunder Creek seems to specify that lower grade material that must be mined to provide access to higher grade is perforce included).
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext