Tyhee announces extension of Ormsby Zone from diamond drilling Friday November 17, 7:00 am ET
TSX Venture: TDC VANCOUVER, Nov. 17 /CNW/ - Tyhee Development Corp. (TSX Venture, TDC) today announced that diamond drilling has intersected long zones of gold mineralization, extending the Ormsby Zone to the south. Drillholes include: 95 metres grading 1.785 grams per tonne gold in NDM361, including 43.5 metres grading 2.773 gpt gold and 9.0 metres grading 6.064 gpt gold.
Dr. David Webb, P.Geol., Tyhee's President and CEO, said "we are very encouraged by these results.
The drillholes are located to the south of the existing resource and have the potential to significantly broaden the resource at the Ormsby Zone.
These drillholes will add gold to the south, where the Ormsby Zone remains open. We continue to be active in this area, with additional drillholes currently being completed. Results from these drillholes will be reported as they are received." . .
Table 1. Recent Diamond Drill Results from the Ormsby Zone South ------------------------------------------------------------------------- From To Length Assay Drillhole (Metres) (Metres) (Metres) (Gold, gpt) ------------------------------------------------------------------------- NDM358 76.0 83.1 7.1 3.980 ------------------------------------------------------------------------- includes 82.0 83.6 1.1 10.182 ------------------------------------------------------------------------- AND 124.0 125.5 1.5 4.318 ------------------------------------------------------------------------- AND 134.5 140.5 6.0 3.139 ------------------------------------------------------------------------- AND 157.0 160.0 3.0 4.620 ------------------------------------------------------------------------- NDM360 93.0 97.0 4.0 1.915 ------------------------------------------------------------------------- AND 102.0 104.0 2.0 4.746 ------------------------------------------------------------------------- AND 125.0 128.0 3.0 2.967 ------------------------------------------------------------------------- AND 170.0 171.5 1.5 2.933 ------------------------------------------------------------------------- AND 249.5 252.0 2.5 1.833 ------------------------------------------------------------------------- NDM361 119.0 214.0 95.0 1.785 ------------------------------------------------------------------------- includes 129.6 198.5 68.9 2.191 ------------------------------------------------------------------------- includes 134.0 177.5 43.5 2.773 ------------------------------------------------------------------------- includes 134.0 143.0 9.0 6.064 ------------------------------------------------------------------------- and 155.0 163.0 8.0 3.288 ------------------------------------------------------------------------- and 173.0 177.5 4.5 4.616 ------------------------------------------------------------------------- AND 258.5 260.5 2.0 3.047 ------------------------------------------------------------------------- AND 275.0 277.0 2.0 7.191 ------------------------------------------------------------------------- True width is approximately 70% of the Length. Dr. Webb added that, "Tyhee remains active on the Yellowknife Gold Project, with two diamond drills continuing to operate 24 hours per day, 7 days a week. As of November 13, 2006 Tyhee has completed over 26,000 metres in 133 diamond drillholes in 2006. Assays are pending on 43 drillholes, including a backlog of 24 drillholes."
Table 2 Location and orientation of drillholes reported in Table 1. ------------------------------------------------------------------------- Diamond Northing Easting Azimuth Dip drillhole (metres) (metres) ------------------------------------------------------------------------- NDM 358 352549 7007967 127.5 -45 ------------------------------------------------------------------------- NDM 360 352549 7007967 127.5 -60 ------------------------------------------------------------------------- NDM 361 352538 7008012 127.5 -60 ------------------------------------------------------------------------- See attached map. The Ormsby North Extension Zone continues to return gold values. The recent series of drillholes are testing the eastern extremities of the Ormsby North Extension.
Table 3. Recent Diamond Drill Results from the Ormsby North Extension ------------------------------------------------------------------------- From To Length Assay Drillhole (Metres) (Metres) (Metres) (Gold, gpt) ------------------------------------------------------------------------- NDM355 32.5 34.5 2.0 2.352 ------------------------------------------------------------------------- NDM356 75.0 78.0 3.0 1.552 ------------------------------------------------------------------------- AND 112.0 116.5 4.5 2.253 ------------------------------------------------------------------------- NDM359 95.5 97.0 1.5 1.316 ------------------------------------------------------------------------- True width is approximately 70% of the Length. NDM 350 returned no significant values.
Table 4. Location and orientation of the drillholes reported in Table 3. ------------------------------------------------------------------------- Diamond Northing Easting Azimuth Dip drillhole (metres) (metres) ------------------------------------------------------------------------- NDM350 353178 7008494 311.5 -45 ------------------------------------------------------------------------- NDM355 353123 7008567 127.5 -45 ------------------------------------------------------------------------- NDM356 353118 7008570 307.5 -45 ------------------------------------------------------------------------- NDM359 353159 7008630 127.5 -45 ------------------------------------------------------------------------- See attached map.
A preliminary economic evaluation of the Yellowknife Gold Project is in progress with results expected by year end. Details from this work will be used to establish parameters required for final submission of Tyhee's application to the regulatory authorities in Yellowknife for operating permits. Drill cores are sawn along their entire length, with one half of the core submitted for analysis and the other half retained on site for archival purposes. Samples are submitted to Acme Analytical Laboratory for preparation and analysis. Blank samples, duplicate samples (riffled splits of coarse crush) and repeat analyses are conducted in addition to analyses of gold standard samples. All samples are analyzed by fire assay techniques on 30 gram aliquots with ICP-ES finish.
D.R. Webb, B.A.Sc. M.Sc. Ph.D., P.Geol. is the Qualified Person, as defined by National Instrument 43-101,on the Yellowknife Gold Project and this press release has been prepared under his supervision. D.R. Webb, B.A.Sc. M.Sc. Ph.D., P.Geol. is the Qualified Person, as defined by National Instrument 43-101,on the Yellowknife Gold Project and this news release has been prepared under his supervision.
About Tyhee Development Corp.
Tyhee Development Corp. is a gold exploration and development company. Its primary asset is the advanced-stage Yellowknife Gold Project, which consists of 6,625 hectares (15,481 acres) of mining leases located 90 km (56 miles) north of Yellowknife, NWT, Canada. The property hosts several areas of gold mineralization, including the partially developed Nicholas Lake Gold Deposit, the Ormsby Zone and the West Zone. A 1 million ounce measured and indicated gold resource has been identified on the property in a report entitled "Report on the Resource Estimate of the Yellowknife Gold Project" dated July 21, 2006, which is filed on SEDAR. Please refer to the original document for all details.
biz.yahoo.com |