<<????????????? Maybe I'm wrong, but show me the assays.>>Yep. Mr Gary Wesa, B.Sc.,F.G.A.C. report Feb , 1997; The Trombetas Project, Para State, Brazil-" Field Reconnaissance Survey of Primary Gold Occurances" Page 3 of 4 quoted: GEOCHEMICAL SAMPLING A total of 20 rock (alluvial float) samples, 11 stream samples & 80 soil samples COLLECTED for analysis by Acme Analytical Labs of Vancouver, B.C. Rock samples consisted of VEIN derived...(from sic) throughout the tailings. In add...altered grantic rocks were sampled to detect the presence of gold in hydrothermally altered bedrock. Soil samples were collected from maily two meter depths in rusty weathered, orange ferruginous latosols peroximal to Garimpeiro workings. Stream silt samples comprised tailings samples from active and abondoned workings. The highest gold values documented were 0.59 to 1.31 OZ/TON in quartz -tourmaline "vein material" from the Curiman workings . The highest gold value in recorded in stream silt was 0.466 OZ/TON iailings from the active Cahalito workings located immediatly east of the airstrip. The highest gold-in-soil values were recorded from soil lines near the Barata North ( 1,630 PPB-AU)(sic- that is that 0ne- Sixth Ounce Per Ton I was talking about, Richie ), Barata ( 424 PPB AU) and Donyeux( 860 PPB AU pits. ( Richie why drill whren ya gots the native PITS and the Sheared up Bedrock to the Surface like the IPM new Logo on there two zones of Bedrock lifting one another up past the surface like is a sight I saw at Black Rick NORTH!) End Section Conclusion Section, Page 4 of 4: Second to last paragraph: An average 18-20,000 tons of ORE PER DAY is processed from a conventional OPEN PIT OPERATION. Proven and probably ( No, Rich I did not miss spell this word, the Engineer wrote this! But, yes after visiting the site but before formal drill- that is to be the next STEP! ) reserves total 69 million tons at 1.5 GRAM/TON for a total of 3.6 MILLION OUNCES of Gold. .....additional work is required to fully assess the property's potential to host large tonnage , economic orebody. The following exploration program is recommended: WHICH IS THE 18 June News Release That I posted This A. M. :1-6 END OF REPORT! Chucaudidn'tseeDrillsMentionedHere, So-What,DoubleTheseNumbersorFind a BIG Grade hole and worry about adding the two together or dividing by a decimale of .50: no matter THEY ALL GOTS THE GOODS! Even your favorite, the more Maxm EXPLORES, the more they FIND! Just like here!!! !!! !!! !!! ! |