Delta project resource calculation Grayd Resource Corporation GYD Shares issued 13,592,942 Sep 11 close $0.48 Mon 14 Sept 98 News Release Mr. John McCluskey reports American Copper & Nickel Co., a wholly owned subsidiary of Inco United States, Inc., has provided Grayd with an update on the 1998 exploration program on the Delta joint venture property near Tok, Alaska. As well, ACNC presented Grayd with the results of a new resource calculation that shows a total inferred resource of 17.3 million tonnes averaging 0.6 per cent Cu, 2.0 per cent Pb, 4.7 per cent Zn, 73 g/t Ag and 1.9 g/t Au. A hole targeted on the PP2 horizon intersected 0.8m (2.8 feet) of massive sulphide grading 1.7 per cent Pb, 3.7 per cent Zn, 66 g/t Ag and 1.11 g/t Au, demonstrating that the PP2 horizon is a large sulphide sheet that is open in three directions. Further work is required to try to find a higher grade keel in order to develop a significant volume of potentially economic grades. A hole drilled to test a geophysical anomaly in the DW area remained in a gabbro intrusion through, and well below, the projected target depth. The source of the high-grade Trio and Supercub massive sulphide float remains undetermined, however drilling has outlined a large hydrothermal system. There is several thousand feet of untested stratigraphy between the Trio and Supercub areas that requires further drill testing. Two holes targeted on the DDS zone in 1998 did not intersect significant sulphides; however, they did supply additional evidence that the deposit occurs adjacent to a relatively underformed rhyolite dome and as such may have significantly more potential than just the relatively narrow trough that has been pursued to date. One hole on DDN appears to have defined the limit of the massive sulphide on the northwest side of the deposit. It remains open to the south and down-dip. A new resource calculation completed by ACNC is summarized in the following table. The manual calculation incorporates drilling by previous operators, as well as, drilling completed by the Delta joint venture between 1995 and 1998. Before the new calculation was made, sample databases were checked with original assay certificates and a number of massive sulphide intercepts from previous operators were re-sampled and assayed. The resource was calculated for the purpose of guiding further exploration only, and does not imply economic viability.
Delta Project - Massive Sulphide Inferred Resource Summary
M- Cu Pb Zn Ag Au tonnes % % % g/t g/t Block Deposit 1.1 1.6 2.4 3.2 102 3.1 DD DDN 2.1 1.1 2.6 6.5 102 2.4 --- --- --- --- --- --- Total DD 3.2 1.2 2.6 5.4 102 2.6
DW-LP DW 0.4 0.4 1.7 4.8 58 1.4 MID 6.5 0.4 1.6 4.5 62 1.6 NUNATAK 0.3 0.3 1.2 2.8 58 2.5 LP 0.6 0.4 2.1 4.9 66 2.2 LPH 1.0 0.4 2.5 5.1 73 1.4 --- --- --- --- --- --- Total DW-LP 8.8 0.4 1.7 4.5 63 1.7
PP2 PP2 5.3 0.4 2.1 4.6 71 1.7 --- --- --- --- --- --- Totals 17.3 0.6 2.0 4.7 73 1.9
The new resource calculation highlights the potential of the Delta property. Most of the deposits are still open, and only a relatively small area of the DW-LP and PP2 sulphide sheets, which extend over a minimum distance of 3km (two miles), has been tested. Higher grade zones within these sulphide sheets, and the 3.2 million tonnes in the stratigraphically higher DDS and DDN deposits, have total metal contents which compare favourably with many operating mines. The potential for discovering additional mineralization of this tenor is considered to be high. The discovery of precious metal rich massive sulphide deposits within the extensive hydrothermal system outlined in the Trio-Supercub area remains a significant component of the exploration potential of the property. Prior to 1998, ACNC spent $5.5-million (U.S.) exploring the Delta property. By financing the $1.0-million (U.S.) 1998 exploration program, Grayd has increased its interest in the Delta joint venture from 16.2 per cent to approximately 27 per cent. (c) Copyright 1998 Canjex Publishing Ltd. canada-stockwatch.com
|