We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : 2026 TeoTwawKi ... 2032 Darkest Interregnum
GLD 408.76+2.6%Jan 5 4:00 PM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: dvdw© who wrote (57749)11/11/2009 9:07:39 AM
From: dvdw©   of 219029
 
Edge to Paraguay, if the China alliance consultants are able to copy or otherwise procure plans for this project outlined below. This could create a Technical advantage for Paraguay while creating a price arbitrage condition, that would be the envy of all arb players world wide.

The Tres Amigas Project, which will be announced today in Albuquerque by New Mexico Governor Bill Richardson, focuses on uniting America’s three power grids for the first time to enable faster adoption of renewable energy and increase the reliability of the U.S. grid.

The three U.S. power grids – or “Interconnections” – are known as the Eastern Interconnection, the Western Interconnection and the Texas Interconnection (also known as the Eastern Reliability Council of Texas, or ERCOT). Power transmission within these three power grids is accomplished primarily utilizing alternating current (AC) power transmission lines. Power transfer between any two of the Interconnections, however, can only be accomplished through special power electronic conversion stations. This is commonly achieved by first converting AC power in one grid to DC as an intermediate power form at a substation, then reconverting from DC back to AC before reaching the adjacent grid. This, in effect, synchronizes power flows. While there are several relatively small bilateral “DC Links” existing today between two Interconnections, all three Interconnections have never been united by one system.

The Tres Amigas renewable energy market hub will be a multi-mile, triangular electricity pathway of Superconductor Electricity Pipelines capable of transferring and balancing many gigawatts of renewable power between the three Interconnections. Similar to highway rotaries used for traffic flow control, multiple power transmission lines from each of the Interconnections will feed power into and out of the Tres Amigas SuperStation through multiple AC/DC converters, each connected by DC superconductor cables. Tres Amigas, which will be a balancing authority, will help ensure the efficient and reliable flow of power from multiple renewable generation sources in all three power grids to customers across a wide area of the U.S., Canada and Mexico.
Report TOU ViolationShare This Post