SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Big Dog's Boom Boom Room

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: onginvester10/26/2006 11:41:31 AM
   of 206151
 
TMR just completed a monster chalk well!

Company's East Texas Austin Chalk/Woodbine Play. The well was recently tested over a two day period at gross daily flow rates as high as 27 million cubic feet of natural gas per day ("Mmcf/d") and as high as 1,500 barrels of oil per day ("BOPD"). Flowing tubing pressures were measured at ranges between 7,500 pounds per square inch ("psi") through an 18/64th-inch choke and 2,400 psi through a 48/64th-inch choke. The dual lateral well was placed on production Monday evening and is in a "clean-up" of drilling fluids phase with intermittent fluctuations normally experienced during the first several day phases of production for wells similarly drilled and produced in the area. Pipeline constraints during the clean-up operations prevent the well from being produced at more than 20 Mmcf/d. The well is currently producing 18-20 Mmcf/d along with an additional 1,000 to 1,500 BOPD. The Company's working interest in the well is approximately 84% before payout (57% net) and 71% after payout (50% net), subject to terms of unitization, lease royalties, acreage and farmout agreements previously negotiated with the third party working and mineral interest owners in the well.

biz.yahoo.com
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext