Scorpio Gold Intersects 3.05 Metres Grading 15.85 g/t Gold on Solberry Zone, Mineral Ridge Project 	                                                 
  finance.yahoo.com        											      	    Press Release  		Source: Scorpio Gold Corporation           	On Monday September 26, 2011, 8:30 am EDT 	                           VANCOUVER, BRITISH COLUMBIA--(Marketwire -   Sept. 26, 2011) - Scorpio Gold Corporation ("Scorpio Gold" or the   "Company") (TSX VENTURE: SGN -  News) announces the initial drill results from the Solberry Zone at the 70% owned Mineral Ridge project, Nevada.
  Peter   J. Hawley, President and CEO reports, "In following up on historical   drill results (Table 1), our initial drilling on the Solberry Zone has   intersected a high-grade zone of enrichment of currently unknown extent   at the northwest margin of the zone, returning 15.85 g/t gold over 3.05   metres (Table 2). The Solberry Zone is located approximately 760  metres  (2,500 feet) west of the Drinkwater open pit where the Company  is  currently mining. Planning for a follow-up program to conduct  in-fill  and step-out drilling of the area of interest is in progress.  Meanwhile,  the drill has moved to the Brodie Zone located 975 metres  (3,200 feet)  southwest of the Drinkwater pit, to follow up on  historical drill  results in that area."
 
 
  Table 1. Solberry Zone - Historical Drill Results                            ----------------------------------------------------------------------------                  From      To   Width    From      To   Width    Gold   Gold Hole No.          (ft)    (ft)    (ft)     (m)     (m)     (m)    OPT    g/t ---------------------------------------------------------------------------- BMR-028            55      60       5   16.77   18.29    1.52   0.161   4.56 ---------------------------------------------------------------------------- BMR-029            85      90       5   25.91   27.44    1.52   0.061   1.73 ----------------------------------------------------------------------------                   100     105       5   30.49   32.01    1.52   0.058   1.64 ---------------------------------------------------------------------------- BMR-030            85     105      20   25.91   32.01    6.10   0.052   1.47 ---------------------------------------------------------------------------- BMR-050             5      10       5    1.52    3.05    1.52   0.027   0.77 ----------------------------------------------------------------------------                    30      40      10    9.15   12.20    3.05   0.108   3.06 ---------------------------------------------------------------------------- BMR-051             0       5       5    0.00    1.52    1.52   0.027   0.77 ----------------------------------------------------------------------------                    35      40       5   10.67   12.20    1.52   0.034   0.96 ---------------------------------------------------------------------------- BMR-053            25      30       5    7.62    9.15    1.52   0.146   4.14 ---------------------------------------------------------------------------- BMR-057            40      45       5   12.20   13.72    1.52   0.018   0.51 ---------------------------------------------------------------------------- BMR-101            40      50      10   12.20   15.24    3.05   0.067   1.90 ----------------------------------------------------------------------------                    95     105      10   28.96   32.01    3.05   0.056   1.59 ---------------------------------------------------------------------------- GW-60-86           45      50       5   13.72   15.24    1.52   0.065   1.84 ----------------------------------------------------------------------------                   145     150       5   44.21   45.73    1.52   0.072   2.04 ----------------------------------------------------------------------------                   165     170       5   50.30   51.83    1.52   0.025   0.71 ---------------------------------------------------------------------------- GW-61-86           10      20      10    3.05    6.10    3.05   0.035   0.99 ----------------------------------------------------------------------------                    25      30       5    7.62    9.15    1.52   0.023   0.65 ----------------------------------------------------------------------------                   110     115       5   33.54   35.06    1.52   0.063   1.79 ---------------------------------------------------------------------------- GW-62-86           85      95      10   25.91   28.96    3.05   0.055   1.56 ----------------------------------------------------------------------------                                                                                                                                                           Table 2. Solberry Zone - Significant Drill Results from 2011 Program         ----------------------------------------------------------------------------                  From      To   Width    From      To   Width    Gold   Gold Hole No.          (ft)    (ft)    (ft)     (m)     (m)     (m)    OPT    g/t ---------------------------------------------------------------------------- MR11158            60      80      20   18.29   24.39    6.10   0.017   0.48 ---------------------------------------------------------------------------- MR11159             5      15      10    1.52    4.57    3.05   0.029   0.82 ---------------------------------------------------------------------------- MR11165            45      65      20   13.72   19.82    6.10   0.116   3.29 ---------------------------------------------------------------------------- MR11167            20      55      35    6.10   16.77   10.67   0.023   0.65 ----------------------------------------------------------------------------                   105     125      20   32.01   38.11    6.10   0.117   3.32 ---------------------------------------------------------------------------- MR11168            50      60      10   15.24   18.29    3.05   0.019   0.54 ---------------------------------------------------------------------------- MR11170            40      45       5   12.20   13.72    1.52   0.018   0.51 ---------------------------------------------------------------------------- MR-11174            0      10      10    0.00    3.05    3.05   0.039   1.11 ----------------------------------------------------------------------------                    30      40      10    9.15   12.20    3.05   0.559  15.85 ----------------------------------------------------------------------------                   110     120      10   33.54   36.59    3.05   0.017   0.48 ----------------------------------------------------------------------------
 
    All   holes presented in the above tables were by reverse circulation (RC)   drilling. True width is estimated at approx.90% of downhole width.   Analytical results were performed by American Assay Laboratory Inc.   (AAL) in Sparks, Nevada, USA. AAL does not have ISO/IEC 17025   accreditation but implements a quality management system following   ISO/IEC 17025 standards and maintains a paperwork trail for ISO/IEC   17025 accreditation. AAL participates in a number of testing and   certification programs, details of which are presented in the Company's   quality assurance and quality control (QA/QC) program for the Mineral   Ridge project at:  www.scorpiogold.com/Documents/QAQC-MR.pdf.   External check assays to verify lab accuracy are routinely completed  by  ALS Chemex, an ISO 9001:2000 certified and ISO/IEC 17025:2005   accredited laboratory.
  President & CEO, Peter J. Hawley,  PGeo,  is the Qualified Person for the Mineral Ridge project and has  reviewed  the content of this release. For additional information please  see the  Company's website at www.scorpiogold.com.
  ON BEHALF OF THE BOARD
  SCORPIO GOLD CORPORATION
  Peter J. Hawley, President & CEO
  The   Company relies on litigation protection for "forward-looking"   statements. This news release contains forward-looking statements that   are based on the Company's current expectations and estimates.   Forward-looking statements are frequently characterized by words such as   "plan", "expect", "project", "intend", "believe", "anticipate",   "estimate", "suggest", "indicate" and other similar words or statements   that certain events or conditions "may" or "will" occur, and include,   without limitation, statements regarding the Company's plans with   respect to the exploration, development and exploitation of its Mineral   Ridge project. Such forward-looking statements involve known and  unknown  risks, uncertainties and other factors that could cause actual  events  or results to differ materially from estimated or anticipated  events or  results implied or expressed in such forward-looking  statements,  including those risk factors outlined in the Company's  Management  Discussion and Analysis for the year ended December 31, 2010  as filed on  SEDAR. Any forward-looking statement speaks only as of the  date on  which it is made and, except as may be required by applicable  securities  laws, the Company disclaims any intent or obligation to  update any  forward-looking statement, whether as a result of new  information,  future events or results or otherwise. Forward-looking  statements are  not guarantees of future performance and accordingly  undue reliance  should not be put on such statements due to the inherent  uncertainty  therein.
  Neither TSX Venture Exchange nor its  Regulation Services  Provider (as that term is defined in the policies  of the TSX Venture  Exchange) accepts responsibility for the adequacy or  accuracy of this  release.
                                		                           	  	Contact: 	  	 	President & CEO Peter J. Hawley (819) 825-7618  phawley@scorpiogold.com  www.scorpiogold.com
  Torrey Hills Capital Investor Relations: Andrew Hoffman (858) 456-7300  ahoffman@torreyhillscapital.com  |