We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : JAVA GOLD

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Bobby Yellin who started this subject9/2/2000 3:31:41 PM
From: robingrayson   of 121
 
DATTELS ISSUED SECOND FALSE PRESS RELEASE
The JVAG Report criticises Stephen Dattels (then Co-Chairman) for issuing a second false press release later in the 1997 season, on behalf of Java Gold Corporation on 16th September 1997:

"Java Gold is operating two gold recovery plants on the Gazar Toson dry placer deposit in the Zaamar valley of north-central Mongolia. Production rates, at full capacity, total 150 cubic metres per hour, with current gold grades ranging from 0.8g/m3 to 1.2g/m3."

THe JVAG Report proves that only ONE gold recovery plant was ever commissioned for 1997, the second gold recovery plant not even tested for 5 minutes.

A section of the JVAG Report is currently being written to determine if the ONE gold recovery plant could conceivably have a capacity of "total 150 cubic metres per hour." The exact specification of the gold recovery plant is known and we are doing the calculations this week - preliminary conclusion is - IF PIGS COULD FLY!

Anyone who made an investment decision on the basis of the News Release may have a claim and should seek professional advice.

Robin Grayson
Author of JVAG Report
General Director of Eco-Minex International Co Ltd