We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Tusk Energy (TKE)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Scotchman who wrote (917)9/20/1998 7:27:00 PM
From: grayhairs  Read Replies (1) of 1207
 
Hi Scotchman,

The well will produce into a pipeline that will transport the gas to the Strachan Gas Plant for processing. That pipeline's operating pressure will be ~1,000 psig. The well could (and in my opinion will) be allowed to flow against that 1,000 psig line pressure. If it does then it will deliver a rate greater than the 4.8 MMCF/d which it yielded on test when the flow was restricted/limited by a 5/16" choke. (You will recall that the wellhead pressure was 2,375 psig when flowing 4.8 MMCF/d.) I estimate that this well will deliver 8-10 MMCF/d at 1,000 psig wellhead pressure and therefore I would use 9MMCF/d. The market of course shall use whatever the market pleases. :-)

Later,
grayhairs