We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Ride the Tiger with CD

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: koan11/19/2007 7:02:04 PM
   of 312988
 
HRG wts. I doubled up on these guys. Production in Dec, looking and acting good.

High River Gold Mines Ltd (C-HRG) - News Release
High River Gold stockpiles 230,000 t at Berezitovy

2007-11-14 17:13 ET - News Release
Shares issued 294,324,710
HRG Close 2007-11-14 C$ 2.66

Mr. Dan Hrushewsky reports

HIGH RIVER GOLD'S BEREZITOVY GOLD MINE ON TRACK TO ACHIEVE COMMERCIAL PRODUCTION IN DECEMBER

High River Gold Mines Ltd. is making construction progress at its unhedged Berezitovy gold project in Russia.

The Berezitovy gold mine is on track to achieve commercial production in December of this year after having poured its first gold bar on Aug. 7, 2007 (see news reported in Stockwatch Aug. 8, 2007). Commercial production is defined as 30 consecutive days of process plant operation at 60-per-cent capacity or better. Berezitovy's annual production, after achieving full production levels, is expected to exceed 100,000 ounces of gold for at least nine years.

Project construction update

Mining

Prestripping has been completed, and mining continues with approximately 230,000 tonnes of ore (approximately two months of production) stockpiled.

Process plant

The crushing, grinding and leach circuits are operating and processing ore. Some minor work remains on the carbon stripping circuit.

Tailings storage facility

The double-lined, zero-discharge tailings storage facility is complete, with the liner laid and the slurry pipeline and radial stacker assembled and operational. Construction of the filter plant is nearing completion, with all components on site and only minor work remaining on electrical and piping connections.

Power generation

Low-cost, reliable electrical power has been available on site for more than two years from the regional hydroelectric power grid, which the project accesses through a 110-kilovolt, 100-kilometre-long power line built by the company. Power costs in 2007 were less than five U.S. cents per kilowatt hour.

Water supply

All pumps and piping supplying water have been installed and are operational. Water sources are abundant and of high quality.

Flotation circuit project

As reported in Stockwatch May 30, 2007, High River announced scoping level plans for the installation of flotation circuits to recover zinc and lead and to improve the recovery of silver. High River is currently planning additional bench-scale confirmatory testwork to refine flotation equipment sizing. Also in the planning stages are permitting and detailed engineering work. Construction of the flotation circuits is tentatively scheduled to begin in the second quarter of 2008 and the production of zinc and lead concentrates could begin as early as January, 2009. As noted in the news reported in Stockwatch May 30, implementation of the flotation circuit project has the potential to significantly reduce the cash cost per ounce gold at Berezitovy through zinc, lead and silver byproduct credits.