SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : TLM.TSE Talisman Energy

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Tomas who wrote (330)6/14/1999 5:38:00 PM
From: John Sladek  Read Replies (1) of 1713
 
Talisman - Successful Development Well at Ross
CLGARY, June 14 /CNW/ - Talisman Energy Inc. today announced completion of the sixth development well on the Ross field in the North Sea. The 13/29a-A4 (RP1) well tested 19,000 bbls/d on a 96/64 inch choke for six hours.

Production was limited by the capacity of the surface testing equipment. ... The well will be tied in to the Bleo Holm Floating Production and Storage Offloading (FPSO) vessel over the next week and is the fourth production well of five planned for the field. Drilling activities on the fifth production well have already commenced. Two water injectors have been completed with two more anticipated.

...The coventure partners in the Ross field are Talisman Energy (UK)
Limited, a wholly owned subsidiary of Talisman Energy Inc. (51.99%)...


Full Story: newswire.ca

Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext