SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Manhattan Minerals (MAN.T)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: KipferlMeister who wrote (2670)6/29/1999 6:39:00 PM
From: mineman  Read Replies (1) of 4504
 
The cover averages 19 m(62 ft), not 15.4 m.(50 ft) as the news release says, and varies from 9 m(30 ft) to 27 m(90 ft) which would make any deposit very difficult to mine.

In most locations the compacted cemented cover is actually thicker averaging 20.3 m (66 ft) if holes 1 (10 m) and 10 (9 m) are subtracted.

Cover thickness from northwest to southeast along the 500 m (1,600 ft) long zone:

Hole 6 = 21 m (68 ft)
Hole 1 = 10 m (33 ft)
Hole 4 = 26 m (85 ft)
Hole 3 = 19 m (63 ft)
Hole 17 = 22.5 m (72 ft)
Hole 18 = 27 m (90 ft)
Hole 19 = 19 m (64 ft)
Hole 7 = 17 m (55 ft)
Hole 16 = 24 m (80 ft)
Hole 9 = 24 m (80 ft)
Hole 21 = 18 m (60 ft)
Hole 20 = 16.5 m (55 ft)
Hole 10 = 9 m (30 ft)
Hole 13 = 16 m (52 ft)
Hole 11 = 16 m (52 ft)
Hole 12 = 27 m (90 ft)
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext