SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Standard Mining, ( Formerly Quest International )

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Robert J Mullenbach who wrote (40)7/12/1999 11:58:00 PM
From: Robert J Mullenbach   of 462
 
Sold, Sold

minemarket.com

skeena got the deal.!!!!!!!!!

XXXXXXXXXXXXXXXXXXXXXXXXXXX

In 1996 a surface bulk sampling program was completed for the Ram 5, Ram 6, and Ram 6.5 pipes. The
samples totaled approximately 90 tons and consist mostly of overburden material mixed with 5% to 10%
kimberlite. Material processed includes 35 tons from the Ram 5 pipe, 15 tons from Ram 6 pipe and 40
tons from Ram 6.5 pipe. A total of six diamonds were recovered from the processed samples. Three
diamonds were found in the Ram 5 sample, three diamonds in the Ram 6.5 sample and no diamonds were
recovered from the Ram 6 sample. The diamonds recovered from the Ram 5 pipe are larger and of much
better quality than those recovered from the Ram 6.5 pipe. Despite the fact that 90% of the Ram 5 pipe
35-ton bulk sample is non-kimberlitic material, diamonds weighing 0.255 ct were recovered.

The most important result of the bulk sample test on the three pipes is the recovery of diamonds. The Ice
property has been proven to be diamondiferous and the property has high commercial potential.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext