We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Idaho consolidated, IDO listed on V.S.E.

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: tanoose who wrote (77)9/29/1999 3:55:00 PM
From: tanoose  Read Replies (1) of 112
 
Newsrelease;

Idaho receives assays from Blakely Creek project

Idaho Consolidated Metals Corp IDO
Shares issued 9,434,650 Sep 28 close $0.40
Wed 29 Sept 99 News Release
Mr. Del Steiner reports
The company is receiving economic platinum and palladium grades from a
reconnaissance program on its Blakely Creek property. The property is one
of four on the Stillwater complex undergoing exploration at this time by
ICMC. The Blakely Creek project is on the west side of the complex near
Chrome Mountain and adjoins Stillwater Mining Company's patented claims in
the area of the Frog Pond adit. The JM reef in the area of the Frog Pond
adit is currently being developed by Stillwater as the East Boulder
project. The East Boulder expansion is projected to increase Stillwater
Mining Company's annual production of platinum and palladium by 500,000
ounces to a total of 1.2 million ounces.
The following assays are on samples collected from the Blakely Creek
project on the projected strike of the Olivine bearing units (Troctolite),
which host the JM reef. The higher grade samples were pegmatoidal
equigranular rocks consisting of primarily olivine and pyroxene minerals
with up to 2-per-cent sulphides. The samples came from outcrop and subcrop
in the Blakely Creek drainage and are similar in appearance to the JM reef
in the Frog Pond adit area. The palladium to platinum ratio of three of the
samples is close to 4 to 1, which is consistent to the ratio of the JM
reef.



Sample Au Pt Pd Rh
Description oz/t oz/t oz/t oz/t

less
than
AG090299-2 0.002 0.022 0.034 0.001

AG090299-3 0.006 0.054 0.214 0.001

AG090299-4 0.007 0.072 0.27 0.002

AG090399-5 0.022 0.186 0.772 0.004

Average 0.084 0.323 0.002

Combined Combined
Pt+ Pt+
Sample Pd+Rh Pd+Rh Pd/Pt
Description oz/t g/Mt Ratio

AG090299-2 0.056 1.63 1.545

AG090299-3 0.269 7.85 3.963

AG090299-4 0.344 10.03 3.750

AG090399-5 0.962 28.06 4.151

Average 0.408 11.89
The samples are prepared at the Chemex facility in Butte, Mont., and then
assayed by Chemex at its facility in Vancouver, B.C., using standard fire
assay procedures.
Because of the talus and overburden, it was difficult to obtain a
stratigraphic thickness of the zone, but based on float and geologic
projection the unit in the area sampled may have a strike length of at
least 3,000 feet. ICMC will continue to evaluate the zone and plan for a
drilling program once permitting is completed.
(c) Copyright 1999 Canjex Publishing Ltd. canada-stockwatch.com

Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext