SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Int'l Wayside Gold Mines Ltd (IWA-VSE)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Little Joe who wrote (493)10/19/1999 9:49:00 AM
From: I Am Sandman  Read Replies (5) of 1321
 

International Wayside receives BC Vein drill hole assays

International Wayside Gold Mines Ltd IWA
Shares issued 11,697,978 Oct 18 close $0.17
Tue 19 Oct 99 News Release
Mr. J. Frank Callaghan reports
International Wayside Gold Mines Ltd. has completed 10 additional surface
diamond drill holes at the BC Vein, on the company's 100-per-cent-optioned
Cariboo gold quartz project; at Wells, near Barkerville Historic Town, in
central British Columbia. Recorded production from the company's ground and
surrounding area is 3.9 million ounces of gold, of which 1.3 million ounces
was lode and 2.6 million ounces was placer.
Thirty-one diamond drill holes have now been completed on the BC Vein.
Twenty-five of these drill holes are along strike, 900 feet grid west of
the BC Shaft and six exploratory drill holes are along strike and test the
BC Vein 700 feet grid east of the BC Shaft.
BC99-09 is the continuation and completion of the BC98-13 through BC99-09
fan location, of definition drilling of an ore grade shoot 300 feet to 600
feet west of the BC Shaft.
BC99-10, 11, 12 and 15 were exploratory holes grid east of the BC Shaft in
an attempt to locate the next high-grade ore shoot, while BC99-14 tested
the configuration of the hanging wall veins intersected in BC99-12 between
88 feet and 120 feet.
BC99-13 intersected the Goldfinch Fault and BC99-16 and 17 intersected the
American extension portion of the BC Vein on the other side of the
Goldfinch Fault which is open for another 600 feet before going into
overburden.
BC99-15 intersected the BC Vein from 258 feet through to 320.1 feet. Sludge
samples indicate anomalous values in quartz stringer zones in a weak,
mariposite-bearing carbonatized zones on both the hanging wall and the
footwall of the BC Vein.
BC99-18 filled in the gap between drill holes BC98-9 and 10.
With the receipt of the assay results listed below, the mineral inventory
for the zone grid west of the shaft is being prepared. In addition, the
unsampled core from areas which returned anomalous sludge samples is being
re-examined and sampled.

Surface diamond drill holes, BC Vein

BC99-09, 2850 N, 18365 E, 4972 EL,
-72 degrees, Az 272 degrees, 285 feet

CORE

Interval Length Assay Assay
(feet) (g/t) (oz/t)

216-224 8.0 1.38 0.040

240.5-244.5 4.0 2.26 0.066

270-272.6 2.6 33.63 0.980

SLUDGE CORE RECOVERY

Interval Length Assay Assay Interval
(feet) (g/t) (oz/t)

175-185 10.0 1.19 0.347 175-185

225-235 10.0 1.06 0.031 215-245

265-275 10.0 0.83 0.024 265-285

275-285 10.0 2.31 0.067 15-285

BC Vein intersection 215 to 244.5

BC99-10, 2888 N, 19333 E, 4961 EL,
-50 degrees, Az 227 degrees, 385 feet

CORE

Interval Length Assay Assay
(feet) (g/t) (oz/t)

102-111.8 9.8 0.44 0.012

111.8-120 8.2 2.37 0.069

124-129 5.0 0.32 0.009

SLUDGE CORE RECOVERY

Interval Length Assay Assay Interval
(feet) (g/t) (oz/t)

65-75 10.0 1.04 0.030 65-75

105-175 70.0 2.39 0.069 105-175

345-355 10.0 1.12 0.032 45-385

Remainder of core 120 to 175 not sampled -
weak carbonitite unit

BC Vein intersection 214-277

BC99-11, 2888 N, 19327 E, 4961 EL,
-50 degrees, Az 257 degrees, 345 feet

CORE

Interval Length Assay Assay
(feet) (g/t) (oz/t)

222.2-224 1.8 1.88 0.054

272.5-275 2.5 2.71 0.079

SLUDGE CORE RECOVERY

Interval Length Assay Assay Interval
(feet) (g/t) (oz/t)

145-165 20 1.36 0.032 145-165

195-295 100 1.64 0.047 195-295

305-335 30 1.30 0.038 305-335
45-345

BC Vein intersection 224-291

BC99-12, 2897 N, 19320 E, 4961 EL,
-50 degrees, Az 2767 degrees, 495 feet

CORE

Interval Length Assay Assay
(feet) (g/t) (oz/t)

88-97 9.0 1.41 0.041

132-135 3.0 1.69 0.049

165-166.5 4.5 3.6 0.105

364.2-390 25.8 5.0 0.145

423-441.7 18.7 3.72 0.108

SLUDGE CORE RECOVERY

Interval Length Assay Assay Interval
(feet) (g/t) (oz/t)

35-45 10 4.54 0.132 25-85

55-65 10 4.13 0.120 85-120

80-120 130 2.26 0.066 120-365

210-360 150 1.11 0.032 365-445

360-445 85 5.26 0.153 445-495

445-495 50 6.94 0.202

BC Vein intersection 364.2-441.7
Weak carbonitized zone 441.7-495.
No core sampled.

BC99-13, 2862 N, 17876 E, 4947 EL,
-50 degrees, Az 224 degrees, 160 feet

CORE

Interval Length Assay Assay
(feet) (g/t) (oz/t)

No core assayed

SLUDGE CORE RECOVERY

Interval Length Assay Assay Interval
(feet) (g/t) (oz/t)

60-110

60-160 No values 110-125
125-160
60-160

BC99-14, 2897 N, 193286 E, 4961 EL,
-70 degrees, Az 276 degrees, 225 feet

CORE

Interval Length Assay Assay
(feet) (g/t) (oz/t)

66-70 4.0 1.57 0.045

191.5-197 5.5 5.62 0.164

SLUDGE CORE RECOVERY

Interval Length Assay Assay Interval
(feet) (g/t) (oz/t)

25-35 10 1.22 0.035

65-75 10 2.91 0.084 65-75

95-145 50 1.55 0.045

185-225 40 1.75 0.051 190-200

Hole targeted on veining in top part of
BC99-12 and not BC Vein.

BC99-15, 2895 N, 19338 E, 4960 EL,
-50 degrees, Az 169, A2 degrees, 345 feet

CORE

Interval Length Assay Assay
(feet) (g/t) (oz/t)

265-305 40.0 4.19 0.122

305-310 5.0 1.25 0.036

SLUDGE CORE RECOVERY

Interval Length Assay Assay Interval
(feet) (g/t) (oz/t)

75-85 10 2.58 0.075 30-250

125-135 10 3.03 0.088 250-260

235-255 20 1.21 0.035 260-305

305-345 40 1.04 0.030 305-345
320-345
30-345

BC Vein intersected 265-305

BC99-16, 2890 N, 17817 E, 4960 EL,
-49 degrees, Az 222, A2 degrees, 170 feet

CORE

Interval Length Assay Assay
(feet) (g/t) (oz/t)

79-80 1.0 12.12 0.353

85-90 5.0 1.60 0.045

90-96 6.0 5.10 0.148

SLUDGE CORE RECOVERY

Interval Length Assay Assay Interval
(feet) (g/t) (oz/t)

80-120 40 2.92 0.085 30-80
80-120
120-170

BC Vein intersected 90-96

BC99-17, 2890 N, 17817 E, 4960 EL,
-70 degrees, Az 222 degrees, 175 feet

CORE

Interval Length Assay Assay
(feet) (g/t) (oz/t)

45-50 5.0 1.79 0.052

103-115 7.0 2.23 0.065

123-126 3.0 4.71 0.137

126-130 4.0 0.07 0.002

SLUDGE CORE RECOVERY

Interval Length Assay Assay Interval
(feet) (g/t) (oz/t)

45-55 10 1.06 0.031 25-120

65-85 10 2.35 0.068 120-130

95-145 50 1.82 0.053 130-175

155-165 10 1.18 0.034 25-175

BC Vein intersected 123-130

BC99-18, 2760 N, 18180 E, 4933 EL,
-50 degrees, Az 224 degrees, 155 feet

CORE

Interval Length Assay Assay
(feet) (g/t) (oz/t)

30-35 5.0 2.13 0.062

42.5-77.5 35.5 15.61 0.455

105-125 20.0 6.67 0.194

128-134 6.0 2.02 0.059

SLUDGE CORE RECOVERY

Interval Length Assay Assay Interval
(feet) (g/t) (oz/t)

15-75 60 8.97 0.261 17-40

75-105 30 1.71 0.049 40-105

105-135 30 11.66 0.340 105-125

135-155 20 2.16 0.063 125-135
135-155
17-155

BC Vein zone 42-134

Before proceeding with the setup for BC99-49 through 21, a proposal has
been made to move to a setup 1,500 feet grid east of the shaft in the area
of the projected Waoming Fault to BC Vein juncture to test for camp
historical higher grade ore shoots near fault vein junctures.
Management believes that an opportunity exists for an open pit mine
together with a high-grade underground operation such as the BC Vein. The
Cariboo gold project consists of the Cariboo gold quartz mine, Island
Mountain mine and the Mosquito Creek gold mine and covers 11,500 acres over
a distance of eight miles by three miles. The company has driffed off to
date thus far a measured and probable resource of an additional one million
plus ounces minable by open pitiable methods depending on cutoff and is
open at both ends and to depth.
(c) Copyright 1999 Canjex Publishing Ltd.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext