SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : NP Energy Cp New

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Geoff Coates-Wynn who wrote ()11/3/1999 5:33:00 PM
From: bully  Read Replies (1) of 22810
 
What happened to this deal?................................

"BULLY"!

To: Geoff Coates-Wynn who wrote (25)
From: WHL
Tuesday, Oct 21 1997 9:59AM ET
Reply # 32 of 44

Company Press Release-Tuesday September 2 9:31 AM EDT

NP Energy Corporation enters negotiations to acquire 100% interest in 14 gold properties in historic gold camp of
Pocone Brazil

LAKE ELSINOR, Calif.--(BUSINESS WIRE)--Sept. 2, 1997--NP Energy Corporation (OTC BB:NPEC) has entered
negotiations to acquire a 100% interest in 14 gold properties in the historic gold camp of Pocone Brazil.

The properties are located 10 kilometers from the town of Pocone at Antena. The potential of the Cuiaba formation at
Antena has been known since 1720 when pioneers exploited gold in the area. More recently, quartz veins and phyllites
with gold grades as high as 10 grams/ton had been mined at the site for 10 years. Mechanical excavators were later used
to open 10 to 20 meter wide trenches in crude open pit mining of between 200 and 1000 cubic meters per pit. Gold
grades from this type of non selective shallow bulk mining were between 0.5 and 2 grams/ton.

Of additional interest to the project is an abundance of tailings material from the early mining process. Tailings dams
contain 1,000,000 cubic meters of material ranging from 0.5 to 2 grams of gold/ton with higher grades at a depth of 10
meters into the tailings. Considering a bulk density of 1.7 grams per cubic meter and an average gold grade of 0.7 grams
gold/ton this tailing dam is expected to contain 1 tonne of gold.

It is recommended that a plant of 2000 tons per day processing capacity be installed immediately. This would produce
1.5 to 2 kilograms of gold per day. The primary in-situe ore has produced 500 kilograms of gold to date and a program
designed to test this ore to depth and block out tonnage is also recommended.

No drilling has been done in the region but, as recoveries from even the low tech mining operations used have proven to
be economic, it is clear that a major gold deposit is possible at this site.

For further information please contact Investor Relations: Dave DiRicco - 415-261-9608

On behalf of the Board of Directors Per: Larry Regis, President

------------------------------------------------------------------------
Contact:

NP Energy Corporation
Dave DiRicco, 415/261-9608

Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext