News release: Mandorin commences drilling on Tafuna Hill Mandorin Goldfields Inc MGD Shares issued 28,273,547 Nov 23 close $0.03 Wed 24 Nov 99 News Release Mr. Malcolm Stevens reports The company has commenced gold exploration and drilling on Tafuna Hill in Zimbabwe. Joint venture activity Exploration work has commenced and is being conducted by the recently formed joint venture with Independence Gold Mining Zimbabwe (Pvt) Ltd. (Indepgold), the Zimbabwe gold mining subsidiary of Lonmin plc. Definitive joint venture documentation is being finalized following the signing of a heads of agreement on Oct. 19, 1999. Indepgold owns and operates seven gold mines within Zimbabwe including the Shamva mine five kilometres away from the joint venture's high-priority exploration target area of Tafuna Hill. A joint venture management committee has been formed to oversee the exploration project, primarily targeting gold mineralization within EPO's 1080 and 1072 and the associated mining claims. History A large number of adits, shafts and other openings cover much of the 14-square-kilometre area of Tafuna Hill. Over the last 100 years numerous mines have independently declared a cumulative recorded production of approximately 7.5 tonnes of gold at an average recovered grade of 13 grams per tonne. Consolidation of mining titles Importantly the joint venture now controls 39 mineral claims within Tafuna Hill. These claims cover many of the former individual mines and adjacent areas. This consolidation of claims allows, for the first time in the history of Zimbabwe, a systematic gold exploration program to be undertaken. Bulk testing It is the intention of Mandorin and Indepgold to identify ore of sufficient grade and suitable metallurgical properties for processing at the Shamva plant. In locations where exposed reefs are possible centres for early production, bulk samples are being obtained for initial metallurgical trials. An initial trial production run of approximately 1,000 tonnes is programmed for processing in the near future through one of the existing plants operated by Indepgold. Initial drilling program On Tafuna Hill there are sufficient drill targets already evaluated to warrant an early reverse circulation drilling program of 600 metres. The aim of the drilling program is to test the possible expectations of known reefs, exposed in underground workings. This is expected to be completed prior to Christmas 1999. Ongoing exploration On Tafuna Hill the current program is concentrating on accessing as many of the known former, and a number of more recently discovered, producing reefs on Tafuna Hill, for mapping, resampling and assay. Available airborne geophysical data, magnetics and radiometrics, obtained from a survey undertaken in early 1999, will be evaluated and a systematic ground follow-up mapping and sampling program will result. Early in the new year (2000) the joint venture expects to have a large number of targets adequately defined in preparation for further drilling. Outside Tafuna Hill, but within EPO's 1072 and 1080, further geophysical interpretation of the available data should be completed prior to Christmas 1999. This will be followed up with ground surveys within the Leviathan (EPO 1080) and Button's area (EPO 1072). Two former small mines, Bob's and the Red Dragon, are programmed for mapping and sampling prior to Christmas 1999. As results are obtained they will be announced. EPO 1073 The company is reassessing its joint venture arrangements with Globemin Resources Inc., in light of encouraging discussions with another interested party. (c) Copyright 1999 Canjex Publishing Ltd. canada-stockwatch.com |