SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Millstream Mines (MLSM)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: RICK who wrote (533)12/2/1999 8:40:00 AM
From: hugh thorne  Read Replies (1) of 664
 
Can anyone tie the following info into the actual results issued in August?

A three-part diamond drill program totaling approximately 23,000 metres is planned for the Potter property. To establish the size, continuity, grade and shape of the Potter copper-zinc massive sulphide deposit two drill rigs will be used. One drill will delineate the deposit at regular intervals from 300 metres to 600 metres below surface. A second drill will be assigned to intersect the deposit at regular intervals from the 600 metres to 900 metres.

A third drill will be employed to test a high priority geological and geophysical target located approximately 500 metres east of the main Potter deposit. This target has identical geophysical and geological characteristics to the Potter deposit.

A highly specialized Real Section induced polarization geophysical survey designed to detect buried deposits will be extended to cover the entire property while delineation drilling is in progress. Priority, high potential anomalies will be tested as diamond drills from the delineation program become available.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext