ESV rig status update:
enscous.com
Well, just yesterday, ENSCO posted that Ensco 29 in the Gulf of Mexico got a contract. Increase by one the total rigs operating.
Gulf of Mexico 3 rigs "available"
North Sea 2 rigs "stacked" 3 rigs "available"
Asia Pacific 2 rigs "stacked" 1 rigs "available"
South America 5 rigs "stacked" 1 rig "available"
Total: 8 rigs available 9 rigs stacked 32 operating 2 under construction Ensco 101 and Ensco 7500 1 rig Ensco 100 North Sea being upgraded 1 rig Ensco 26 from GOM being upgraded
I have printouts from 1/12, 1/19, 1/22, 1/29, 2/6, 2/8, 2/12, 2/19, 2/23, 3/15, 4/10, 4/24, 5/24, 6/12, 8/01, 8/20, 9/4, 9/12, 9/21, 10/4, 10/25, 11/4, 11/15, 12/13, and 12/15.
IMO
steve |