Brian: Looks like they've started.................
NovaWest to commence drilling at GoldenPoly NovaWest Resources Inc NVE Shares issued 15,730,865 Jan 6 close $0.28 Fri 7 Jan 100 News Release Mr. Frank Puskas reports Diamond drill equipment has arrived at the GoldenPoly polymetallic Zn-Cu-Au-Ag and LodeGold-Ag project and drilling will commence the week of Jan. 10, 2000. The GoldenPoly project is situated in Pense township in Northeastern Ontario, 30 miles southeast of Kirkland Lake and 20 miles north of New Liskeard/Cobalt. The company has staked and/or purchased an additional 28 contiguous claim units, bringing the total to 45 claim units (1,800 acres) in order to encompass potential extensions of the mineralization identified to date. Previous drilling by NovaWest on the GoldenPoly intersected layered mineralization. The upper zone of borehole GP-97-3 intersected 29.6 feet grading 1.63 grams per tonne Au, 0.089 per cent Cu and 1.30 per cent Zn or the equivalent of 3.55 per cent Zn over 29.59 feet. The upper zone of borehole GP-97-4 intersected 12.92 feet grading 1.82 g/t Au, 0.125 per cent Cu, 2.43 per cent Zn and 3.93 g/t Ag or the equivalent of 4.93 per cent Zn over 12.92 feet. A lower zone in borehole GP-97-4 intersected 40 feet of stratified Au-bearing, Zn-enriched base metals grading 0.0855 g/t Au, 0.1599 per cent Cu, 2.28 per cent Zn and 1.48 g/t Ag over 25.26 feet. The two mineralized zones, averaging 28 feet in thickness are conformable within an east-striking, south-dipping (50 degrees) sequence of metasediments with intercalated (komatilitic) volcanics. The mineralized zones have a strike length in excess of 1,000 metres and a southwesterly grade increase in direction of the identified geophysical anomaly and rake of mineralization. Earlier drilling by others intersected 1.93 per cent Zn over 28.9 feet, 1.88 per cent zinc across 29.7 feet and 1.42 per cent Zn over 43 feet. This drill program is the first of a series planned for numerous of the company's Ontario projects in the coming months. The total drilling footage of the programs is expected to exceed 15,000 feet and will be the most extensive drill program undertaken by NovaWest to date. Specifics on the other projects to be drilled will be forthcoming.
Mike |