DELGRATIA REPORTS RESULTS OF DRILL HOLE 6 AT NEVADA PROJECT
VANCOUVER, British Columbia--(BUSINESS WIRE)--April 28, 1997-- Delgratia Mining Cor(NASDAQ:DELGF.) Delgratia Mining Corporation has received encouraging assay results from Drill Hole 6 at the Nevada Project located 40 miles south of Las Vegas.
Drill Hole 6 was the first of four holes drilled along the new fence (BB'), parallel and 7,000 feet to the north of Drill Hole 3 on the first fence (AA'). (The first five holes on AA' have been previously reported April 10, 1997 in news release No. 97/05). The samples were prepared under the direction of and assayed by the Project's Chief Assayer, Mr. Dave Camacho (28 years experience) with splits checked by registered assayers at Jacob's Lab in Tucson, Arizona. Assay results are reported below for Drill Hole 6 with a listing of results in the Appendix.
Drill Hole Interval Rock Gold Assays Hole # Depth Feet Unit opt g/t 6 1240' 0 - 640 Coarse 0.122 4.17 Sediments (Intrusive) 640 - 900 Coarse 0.003 0.12 Sediments (Andesitic) 900 - 1160 Andesites 0.023 0.80 1160 - 1240 Intrusives 0.004 0.13
The top 640' of Drill Hole 6 consists principally of coarse sedimentary layers of intrusive origin similar to material intersected in Drill Holes 3 and 4 on Fence AA'. The underlying andesitic coarse sediments, andesites and intrusives are each essentially barren. The exact nature and extent of the gold mineralization on the Nevada Project is just starting to be understood. This gold system has some features that are different from other known Nevada deposits and thus our geologic model is still evolving. It will require many more drill holes together with mineralogical and metallurgical testing before its geologic significance can be reasonably understood.
A second reverse circulation drill rig arrived at the property and is expected to commence drilling this week. The new rig will be probing to depths of 2,000 feet. This will allow for deeper penetration of the underlying intrusive rocks to determine their nature and relationship to the gold mineralization at depth. The current 75,000 foot exploration program will also be accelerated and the Company will be able to proceed with in-fill drilling between the AA' and BB' fences more rapidly. The Company will continue to have assays verified by registered and/or certified assayers based in the U.S. and/or Canada. The Company's consulting engineers are continuing their review of drilling procedures, sample collecting and assaying procedures. Further work will include mineralogical and metallurgical testing. Results will be reported when available.
"The arrival of a second drill rig on site will allow us to probe deeper and to speed the development of the gold project" says Dr. Ager. ON BEHALF OF THE BOARD OF DIRECTORS
Dr. Charles A. Ager, PEng, PGeo Chairman and President and Chairman
Delgratia Mining Corporation Nevada Project Drill Hole 6 Average Grade Gold = 0.122 (0 - 640') ------------------------------------------------------------- Chief Assayer Jacobs Lab Footage Grade Grade From To Au/Opt Au/Opt ---- ---- ------ ------ 0 20 0.264 0.256 20 40 0.165 0.184 40 60 0.139 0.129 60 80 0.054 0.039 80 100 0.006 0.003 100 120 0.013 0.006 120 140 0.253 0.241 140 160 0.140 0.136 160 180 0.013 0.002 180 200 0.006 0.001 200 220 0.024 0.098 220 240 0.021 0.013 240 260 0.002 0.003 260 280 0.134 0.123 280 300 0.224 0.242 300 320 0.035 0.027 320 340 0.029 0.028 340 360 0.668 0.618 360 380 0.357 0.354 380 400 0.005 0.004 400 420 0.003 0.001 420 440 0.240 0.269 440 460 0.118 0.112 460 480 0.012 0.002 480 500 0.012 0.008 500 520 0.226 0.328 520 540 0.485 0.485* 540 560 0.022 0.015 560 580 0.192 0.186 580 600 0.011 0.010 600 620 0.009 0.004 620 640 0.012 0.001 *Using Chief Assayer Value (Awaiting Assay Results) Chief Assayer Jacobs Lab Footage Grade Grade From To Au/Opt Au/Opt ---- ---- ------ ------ 640 660 0.001 0.002 660 680 0.003 0.002 680 700 0.002 0.001 700 720 0.002 0.003 720 740 0.001 0.003 740 760 0.003 0.001 760 780 0.009 0.001 780 800 0.004 0.001 800 820 0.001 0.001 820 840 0.001 0.002 840 860 0.002 0.002 860 880 0.009 0.003 880 900 0.006 0.001 900 920 0.002 0.001 920 940 0.002 0.001 940 960 0.001 0.001 960 980 0.002 0.001 980 1000 0.003 0.002 1000 1020 0.004 0.002 1020 1040 0.153 0.143 1040 1060 0.004 0.002 1060 1080 0.002 0.001 1080 1100 0.003 0.005 1100 1120 0.002 0.006 1120 1140 0.002 0.010 1140 1160 0.125 0.127 1160 1180 0.007 0.004 1180 1200 0.004 0.004 1200 1220 0.002 0.004 1220 1240 0.002 0.006 Hole 6 Assay Summary Chief Assayer Jacobs Lab Rock Units Intervals Gold Gold ------------------------------------------------------------- Coarse Sediments (Intrusive) 0 - 640 0.122 0.119 Coarse Sediments (Andesitic) 640 - 900 0.003 0.002 Andesites 900 - 1160 0.023 0.023 Intrusives 1160 - 1240 0.004 0.004
Copyright 1997, Business Wire. All of the releases provided by Business Wire are protected by copyright and other applicable laws, treaties and conventions. Information contained in the releases is furnished by Business Wire's members, who are solely responsible for their content, accuracy and originality. All reproduction, other than for an individual user's reference, is prohibited without prior written permission. |