ESV rig status update:
enscous.com
Things are picking up a little.
Gulf of Mexico 2 rigs "available"
North Sea 1 rig "stacked" They have dropped 4 rig's status. Status is blank, I assume 6 total still no contract. The page shows dates and companies though. Odd.
* The new ENSCO 101 build has left the yard and is enroute to the North Sea. I added it into the 6 total above.
Asia Pacific 2 rigs "available" South America 6 rigs "stacked" Total: 16 rigs available or stacked 35 operating 3 rigs being upgraded or built.
I have printouts from 1/12, 1/19, 1/22, 1/29, 2/6, 2/8, 2/12, 2/19, 2/23, 3/15, 4/10, 4/24, 5/24, 6/12, 8/01, 8/20, 9/4, 9/12, 9/21, 10/4, 10/25, 11/4, 11/15, 12/13, 12/15, 1/4/00, 1/17/00, 1/21/00, 1/31/00, and 2/17/00.
IMO
steve |