We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : NDT VENTURES

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Elizabeth Andrews who wrote (933)1/4/2001 11:03:20 PM
From: charred  Read Replies (1) of 992
 
"Does the structure have the potential to hold 50 million tonnes?", don't know yet. But to the southeast samples returned 1.75 grams Au. What about 30 million tonnes at 1.2 grams Au.

"Mining rate 20,000 tonnes per day? Costs less than US$6 per tonne? Average grade 1.2 g/tn? 80% recovery? Overall stripping ratio 3:1? Average thickness 30 meters? Strike length?", this what the scoping study will tell us.

About risk. I prefer the treasury to be spent on drilling than on management salaries and the Vancouver office. It takes a lot to find good quality projects. This one shows promise. For myself I see no risk. I know when to bail.

Cheers