We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : High Tolerance Plasticity

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: energyplay who wrote (439)2/27/2001 8:17:53 AM
From: BCherry168  Read Replies (1) of 23153
 
Energyplay; Re drill time to 5400 ft. I think you have it at about double what it actually is for drilling time, but if you include the time it takes to complete the well and get it on stream, it will take a lot longer. There are so many variables, it is very difficult to come up with an accurate number. Availability of rigs and other equipment, and serious shortages of qualified personnel creates lots of problems. I can remember at the peak of the last boom, we had to wait several months for a drilling rig, then several months for a completion unit, and if we needed electricity, we might have to wait a long time for that.
Bottomline: my WAG is that we are not going to get enough new gas on line this year to avoid a pretty good shortage next winter, barring a real warm winter and a real cool summer. We will see.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext