Atna Resources Ltd ATN Shares issued 21,108,557 Mar 6 2001 close $.450 Mar 7 2001 7:05:47 Mr. David Watkins reports Atna Resources Ltd. has completed 13 reverse circulation (RC) drill holes totalling 1,862 metres on the Monterde gold-silver property in Chihuahua state, Mexico (see Stockwatch Sept. 20 and Nov. 21, 2000). Significant assay results for all holes are:
Hole From To Length Au Ag No. (m) (m) (g/t) (g/t)
MTR-09 44- 62 18 1.02 296.3 10 52- 58 6 1.05 72.0 76- 82 6 1.97 130.3 11 86-102 16 0.57 47.8 12 68- 84* 8 1.23 44.0 13 78- 88 12 2.63 65.5 14 34- 56* 18 1.70 147.0 15 54- 64 10 1.85 53.4 16 44- 62 18 1.30 51.1 82- 86 4 1.37 32.0 17 78- 86 8 3.04 149.0 240-246* 2 5.56 138.0 18 No significant assays (postmineral dike/flow complex) 19 198-276 80 3.10 8.8 Incl. 198-204 6 11.10 31.9 252-264 12 9.83 18.1 20 126-132 6 2.71 21.8 176-182 6 7.46 11.1 21 86- 92 6 6.17 45.1 156-158 2 1.38 47.1
* Includes intersected underground workings. Holes MTR 9 to 21 tested mineralized rock adjacent to the old mine workings along the Carmen shear system. All holes were sampled at two-metre intervals. Samples, including blanks, standards and duplicates, were prepared by ALS Chemex in Chihuahua, Mexico, and sent to its laboratory in Vancouver, B.C., for assay. The Los Hilos A and B zones appear to be structures located between the main Los Hilos and Carmen shears. Holes MTR 1 to 8 were drilled in 1998 by Golden Treasure Resources to test the subparallel Los Hilos structures and the Carmen shear. Kimber Resources Inc., a private company, which optioned the property to Atna, had estimated a potential resource of 10.5 million tonnes grading 2.1 grams per tonne gold and 66.7 g/t silver within the Carmen shear mineralized system prior to Atna's drilling program. Atna will compile and review results from the drilling, surface and underground sampling and preliminary bottle-roll tests prior to determining future plans for the property. A plan map showing the location of holes is available on request and on Atna's Web site www.atna.com. Atna is a well-financed mineral resource company focused on acquiring projects with potential for near-term cash flow and exploring properties that have the potential for significant discoveries.
MONTERDE DEPOSIT REVERSE CIRCULATION DRILL COLLARS
Hole No. Easting Northing Elevation MTR-01 788251.39 3055724.44 2340.61 MTR-02 788304.23 3055705.28 2315.81 MTR-03 788084.63 3055624.85 2360.10 MTR-05 788181.98 3055614.39 2324.89 MTR-06 788367.10 3055693.18 2294.77 MTR-07 788375.64 3055747.95 2292.50 MTR-08 788281.84 3055535.78 2305.51 MTR-09 787940.92 3055677.70 2419.06 MTR-10 787974.15 3055673.77 2400.20 MTR-11 788000.07 3055703.56 2395.33 MTR-12 788094.62 3055649.91 2346.56 MTR-13 788073.31 3055668.25 2354.85 MTR-14 788102.19 3055608.83 2358.22 MTR-15 788185.68 3055587.54 2335.01 MTR-16 788233.95 3055586.16 2308.56 MTR-17 788195.97 3055725.30 2350.41 MTR-18 787879.39 3055688.88 2433.16 MTR-19 788050.70 3055760.85 2390.33 MTR-20 788370.84 3055643.84 2278.27 MTR-21 788232.08 3055653.06 2314.76
MONTERDE DEPOSIT REVERSE CIRCULATION DRILL COLLARS
Hole No. Azimuth Inclination MTR-01 225 -55 MTR-02 205 -55 MTR-03 225 -65 MTR-05 225 -55 MTR-06 205 -50 MTR-07 205 -50 MTR-08 225 -60 MTR-09 225 -60 MTR-10 225 -60 MTR-11 225 -60 MTR-12 225 -60 MTR-13 225 -60 MTR-14 225 -55 MTR-15 225 -60 MTR-16 225 -65 MTR-17 225 -70 MTR-18 225 -70 MTR-19 225 -75 MTR-20 225 -70 MTR-21 225 -65 Hole No. Total Length
MTR-01 92 MTR-02 106 MTR-03 86 MTR-05 116 MTR-06 124 MTR-07 92 MTR-08 44 MTR-09 96 MTR-10 102 MTR-11 182 MTR-12 118 MTR-13 128 MTR-14 80 MTR-15 74 MTR-16 112 MTR-17 246 MTR-18 80 MTR-19 278 MTR-20 198 MTR-21 168 |