We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Intel Corporation (INTC)
INTC 37.35+0.2%10:01 AM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: semiconeng who wrote (132808)4/18/2001 11:43:32 AM
From: fingolfen  Read Replies (1) of 186894
 
I don't think the 300mm Fab ramp will be as quick as you think. Intel just announced that the Oregon Development Fab D1C just got 0.13u yielding on 300mm. Fab22 in Arizona is going to start up on 200mm, not 300mm. Additionally, most 200mm equipment is not 300mm compatible, which would require intel to remove the current equipment, and replace it.

You would know better than I, but I thought that Intel had indicated they were building a second 300mm fab in New Mexico (and a third in Ireland, but that has been pushed out until the 0.10 micron technology). F22 in Az I thought was ALWAYS just going to be 200mm 0.13...