SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Claude Resources TSE.CRJ Undervalued Junior Gold Anyone?

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: geoffb_si who wrote (285)6/18/2001 4:20:32 PM
From: Gord Bolton  Read Replies (1) of 359
 
Claude Reports Madsen Drill Results

CALGARY, June 18 /CNW/ - The first phase of exploration drilling at
Claude Resource's Madsen, Red Lake project has been completed by Placer Dome
(CLA) Limited.
The Phase I drilling program of four holes totaling 11,257 feet (3,431
metres) was designed to test the structure and stratigraphy of the target area
presumed to host the historic, high-grade No. 8 Zone.
The four holes tested 3,200 feet (975 metres) of strike length along the
interpreted trace of the mafic/ultramafic contact and targeted an intercept
depth half way between the surface and the known No. 8 Zone workings. The
program was successful in defining a recognizable, grossly repetitive
stratigraphy described as similar to the one that hosts the high-grade at
Placer Dome's Campbell mine and the adjacent Goldcorp deposit.
While this phase of stratigraphic drilling was not initiated to intersect
high-grade targets, a zone tentatively correlated with the No. 8 Zone was
reported in the program's 4th hole. It averaged 814 parts per billion Au (ppb)
over 31 feet (9.45 metres) including a 3.8 foot (1.16 metres) interval that
assayed 4.1 grams per tonne Au. This and other geochemically-elevated assay
intervals within a restricted corridor bracketing the mafic/ultramafic contact
furnish direct evidence of a mineralizing system well within the footwall
(2,000 feet or 609 metres) of the Madsen mine.
A second phase of drilling that targets the up-plunge projection of the
No. 8 Zone is currently in progress.
%SEDAR: 00000498E

-30-

For further information: Neil McMillan, Claude Resources Inc.,
President, (306) 668-7505;
To request a free copy of this organization's annual report, please go to
www.newswire.ca and click on reports@cnw.

newswire.ca
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext