SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : SRU-ASE : STARFIELD RESOURCES

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: winston.s.c who wrote (1189)7/9/2001 7:04:24 PM
From: CIMA   of 1239
 
STARFIELD RESOURCES INC.
PRESS RELEASE July 9th, 2001
Corporate Office: #SRU-12-01
Suite 420-625 Howe Street
Vancouver, BC CANADA SRU.CDNX
V6C 2T6 SRFDF – OTC BB
Tel: (604) 608-0400 Fax: (604) 608-0344
Toll Free: (877) 233-2244 email: info@starfieldres.com website: www.starfieldres.com Page 1 of 1

Ferguson Lake Nickel-Copper-Cobalt-Platinum-Palladium Project, Nunavut, Canada

64.5 METER (212 FEET) DRILL INTERSECTION
AT FERGUSON LAKE WEST ZONE
(Click Above to see Longitudinal Map)

Starfield Resources Inc. is pleased to report assay results for Drill Holes FL01-73 and FL01-74 from the West Zone at the Company’s Ferguson Lake Nickel-Copper-PGE-Cobalt project. Hole FL01-73 was drilled on Section 5734 West and extended higher-grade mineralization a further 80 meters below the depth previously reported.

Hole FL01-74 was drilled on Section 5856 West to test the massive sulphide unit mid-way between intersections obtained and reported earlier in Holes FL01-71 and FL01-72 which are 200 meters apart. This hole significantly extends the higher-grade core mineralization identified at Ferguson Lake West Zone.

Results are summarized in the accompanying table.

Length
Hole No. Interval (m) (m) (ft) Cu(%) Ni(%) Co(%) Pd (g/t) Pt (g/t) Pd+Pt (g/t)

FL01-73 579.00-580.16 1.16 3.9 0.52 1.09 0.127 5.00 0.28 5.28
583.65-590.82 7.17 23.6 1.22 0.64 0.079 1.64 0.16 1.80
(including 584.20-588.20 4.00 13.2 1.18 1.04 0.127 2.43 0.22 2.65)
601.40-602.62 1.22 4 2.52 0.29 0.043 1.00 0.98 1.98
605.53-607.27 1.74 5.7 1.3 0.71 0.083 1.65 0.03 1.68

FL01-74 370.30-434.75 64.45 212.7 0.96 0.53 0.064 1.4 0.24 1.64
(including 370.30-395.87 25.57 84.4 1.07 0.77 0.091 1.94 0.35 2.29)
(and 370.30-387.37 17.07 56.3 1.19 0.88 0.105 2.2 0.39 2.59)

Currently, holes FL01-81 and FL01-82 are being drilled, and mineralized intersections from holes FL01-75, 76, 77, 78, 79 and 80 are being processed.

The Company’s assayer, Bondar Clegg, has completed a property-wide laboratory test of core samples to determine an accurate specific gravity for the various styles of mineralization identified at Ferguson Lake. These new technical results are being compiled and, with inclusion of 2001 drill results to date, will allow Starfield’s independent Consulting Engineer, N.C. Carter, P.Eng., Ph.D. to produce an updated resource estimate that will be published upon receipt.

On behalf of the Board of Directors

“Glen Macdonald”

Glen Macdonald, P.Geol., Director
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext