SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Intel Corporation (INTC)
INTC 36.91-1.1%Dec 31 3:59 PM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Mary Cluney who wrote (141191)8/9/2001 10:54:45 PM
From: pgerassi  Read Replies (2) of 186894
 
Dear Mary:

The cost of the system in not $53 million. The award will link systems that either already exist or will exist. Terra Grid is the linkage of the systems (the network and software linking the systems) at 4 computing sites one of which has a preexisting contract for a 300 processor system. A portion of $53 million for the high speed network linking these machines is not a bad price since two are in Illinois (Batavia and Urbana-Champaign) and two in California (Pasadena and San Diego).

Evidently you thought that was the whole price for all of it. Need to read the press release more carefully. Probably the upgrade of the current gigabit net currently in place between SCSA centers.

Of course $53 million could buy 10K Dual Athlon MP 1U servers in a far more powerful cluster with over 3QB (Quadrillion bytes of storage, 1000 TB or 1,000,000GB), capable of more than 40 teraflops with less than 10% in CPUs and still have money left over. And it is available now, not in 2002.

Pete
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext