We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Intel Corporation (INTC)
INTC 48.32-0.8%Jan 15 3:59 PM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Dan3 who wrote (153941)1/5/2002 8:43:07 PM
From: semiconeng  Read Replies (2) of 186894
 
I think they may have built more than they need for next year, certainly they've built enough.

But FABs for CPU production generally need to be almost completely rebuilt every 2 years.


---Now Now, that's not true Dan. Fabs are built to conform to a Cleanliness Level. State of the art is Class 1, which means there can be no more that 1 particle of dirt, 1 micron in size in 1 cubic centimeter of air. Class 10, Class 100, Class 1000, all follow the same rules.

---In addition, generally more than 50% of the Process Tools can be reused in the new process, assuming that the wafer size doesn't chsange. It might interest you to know that Fab6 closed after being in service for 20 years. The Fab itself was never "rebuilt".

It may be that once the .13 generation is in full swing, Intel will be able to close several of those FABs and won't have the costs of upgrading them to .09 and SOI.

---I don't think they're going to close any 0.18u, or 0.25u Fabs, as they are all Class 1 Fabs. I don't know of any 0.35u production going on. Fab 7/9, the current oldest Fabs are being re-equipped for 300mm.