We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : KOB.TO - East Lost Hills & GSJB joint venture

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Hopsalong who wrote (15454)1/22/2002 4:30:49 PM
From: Salt'n'Peppa  Read Replies (1) of 15703
 
Since you resurrected the board, this just in from LHG:

-------------------------------------------
SUBJECT: ELH update Posted By: LostHillsGuy
Post Time: 1/22/02 16:13

Rumors, but they may be true.
I heard they will run liner (standard, cemented string) across the Bloemer/Phacoides at #4 for a completion attempt.

#9 has experienced gas kicks from two fractured sandstone zones and raised the mud weight. Finally got the hole stabilized and are pulling out of the hole to run E-logs, then probably run casing to seal off these areas before drilling ahead.

All pretty good news.

LHG
--------------------------------------------

...and lest we forget, this was from PYR's report of Dec 14th:

OPERATIONAL HIGHLIGHTS:
PYR is participating in three wells currently drilling at East Lost Hills:
The ELH #4 well is at a depth of 19,450 feet where 7`` casing has been installed. Drilling operations are expected re-commence shortly to drill to the anticipated total depth of 20,500 feet. The well is currently in shale directly above the lower Temblor sands. This well was sidetracked in October and correlative analysis indicate that this sidetracked well bore is as much as 400 feet higher than the original ELH #4 well bore.

The ELH #9 well is currently at a depth of approximately 17,600 feet, approximately 100 feet into the top of the Temblor formation. Preparations to run an intermediate string of casing to the current depth are underway. After installation of the casing, it is expected this well will continue to drill to the anticipated total depth of 21,000 feet.

PYR owns a 12.12% working interest in each of the ELH #4 and ELH #9 wells, both operated by Anadarko Petroleum
Corporation.
----------------

Cheers,
S&P