Intel has the following facilities: D1BR - 200,000 sq. ft. (once development, now production) D1C - 135,000 sq. ft. [.13 -> .10] D1D - 175,000 sq. ft. [development] D2 - 36,000 sq. ft. in 1991 [.18/.13] flash RP1 - 56,000 sq. ft. [development] FAB1-7 - 435,000 sq. ft. closing next year [.35] flash [edit: 435,000 Rio Rancho+ clean room total includes sq. ft. from old 1-7,9, and the new 11] FAB8 - ? [.35 and above] FAB9 - 120,000 flash [upgraded in 2000, still open] FAB10 - 100,000 sq. ft.? [.25/.18] FAB11 - 120,000 sq. ft.? [.18 -> .13] flash FAB11x - 135,000 sq. ft. [.13] FAB12 - 135,000 sq. ft. [.18] FAB14 - 90,000 sq. ft. [.25/.18] FAB15 - 120,000? [.35/25] -> [.18/.13] flash FAB16 - On Hold FAB17 - 95,000 sq. ft. [.13] FAB18 - 80,000 sq. ft. [.18] FAB20 - 120,000? [.13] FAB23 - 120,000 sq. ft. [.18] flash FAB22 - 133,000 sq. ft. [.13] FAB24 - 135,000 sq. ft. - under construction
Do you know where F20 and D1B are located? Does D1b exist today? Many flaws in your fab list, what is your source?
d1b does not exist. F20 and D1b were together in the same fab. Some tools were isolated to run D1B material (P860) and some for P858 (F20), back about 1-2 years ago. Today all development went to D1C, and D1b tools were consumed by f20 since it really was only one fab.
In your analysis of fabs, it would be helpful to show the status of the ramp in each fab. Is D1D ramped and all 175,000 available?
The fab point is junk as posted |