SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Claude Resources TSE.CRJ Undervalued Junior Gold Anyone?

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Enigma who wrote (311)5/8/2002 5:48:40 PM
From: Al Collard   of 359
 
Claude Reports New Gold Discovery

SASKATOON, SK, May 8 /CNW/ - During the 2002 winter exploration season,
Claude Resources Inc. completed 3,355 metres of BQ core drilling in 18 holes
on the West Porky project approximately two kilometres north of the Company's
wholly-owned Seabee mine. The discovery is on the Currie Rose property in
which Currie Rose has a 30% Net Profits Interest. Following up from previous
programs, prospectors in 2000 discovered visible gold in outcrop coincident
with a two-kilometre geochemical anomaly.
>>
Drill results are as follows:
Table One
---------

Hole No. From (m) To (m) Length (m) Au (g/t) Host Rock
-------------------------------------------------------------------------
PKY02-01 69.25 72.30 3.05 54.33 Fault in calc-silicate
122.70 125.70 3.00 14.12 Silicified arenite

PKY02-02 35.00 36.70 1.70 2.69 Calc-silicate

PKY02-03 36.50 39.30 2.80 1.83 Calc-silicate
50.95 52.30 1.35 8.90 Silicified arenite
62.20 64.40 2.20 8.46 Silicified arenite

PKY02-04 37.90 39.80 1.90 4.62 Calc-silicate
73.55 77.40 3.85 15.79 Silicified arenite

PKY02-05 15.30 16.40 1.10 2.43 Calc-silicate
18.30 19.50 1.20 2.87 Calc-silicate

PKY02-06 12.00 13.00 1.00 3.74 Calc-silicate
67.20 70.70 3.50 6.04 Silicified arenite

PKY02-07 128.80 130.20 1.40 10.70 Calc-silicate
152.60 155.00 2.40 1.32 Silicified arenite

PKY02-08 107.10 111.40 4.30 3.06 Silicified arenite

PKY02-09 64.95 66.80 1.85 6.90 Calc-silicate
117.10 118.70 1.60 2.37 Silicified arenite

PKY02-10 25.40 26.50 1.10 1.10 Calc-silicate

PKY02-11 37.00 37.50 0.50 54.96 Calc-silicate
101.30 104.90 3.60 12.44 Calc-silicate

PKY02-12 87.50 88.20 0.70 1.49 Silicified arenite

PKY02-14 179.60 182.00 2.40 7.44 Calc-silicate
188.90 191.75 2.85 4.34 Calc-silicate

PKY02-15 239.80 241.20 1.40 1.98 Calc-silicate
246.90 248.50 1.60 2.37 Silicified arenite

PKY02-16 202.15 204.10 1.95 9.98 Calc-silicate
227.70 229.45 1.75 3.51 Silicified arenite

PKY02-17 191.10 191.60 0.50 1.71 Calc-silicate
257.10 257.80 0.70 1.65 Silicified arenite

PKY02-18 333.55 335.20 1.65 1.83 Calc-silicate
338.70 340.70 2.00 4.00 Silicified arenite
>>
To date, the Company has drill-tested approximately 600 metres of this
target's strike length for that portion that substantially parallels a major
metamorphosed volcano-sedimentary rock contact. Gold values have been recorded
in several rock types, with significant intersections encountered in both a
feldspathic arenite (sedimentary unit) and a calc-silicate (altered mafic
volcanic rock) over two-thirds of the strike length tested.
The mineralized intervals (Table One) coincide with a SSE trending,
steeply dipping (75 degrees SW) shear structure. This shear system appears to
diverge from the arenite contact near the closure of the Porky Lake synform.
The limited on-ice winter drill season did not permit sufficient time to
evaluate the mineralized system's continuity to the southeast. This, as well
as the structure's projection to the northwest will be the focus of the
Company's next drill program.
The strongest part of the system is a banded, altered diopside-bearing
mafic volcanic shear zone that is well mineralized for at least 400 metres of
strike length (shown on the accompanying plan map and longitudinal section -
available on the Company's website: www.clauderesources.com). Gold values
correlate positively with the presence of sulfides, principally pyrite and
pyrrhotite with minor arsenopyrite. Gold values between 2 and 15 grams per
tonne uncut were routinely recorded over intervals ranging from 1 to 3 metres.
Appreciably higher gold values associated with arsenopyrite over comparable
widths were returned from a silicified portion of the feldspathic arenite.
Additionally, this drilling yielded very high-grade intersections associated
with fault gouge that locally marks the volcano-sedimentary contact.
The core from this program was logged and split at the Company's logging
facility at the Seabee mine. Assaying has been done by TSL Laboratories of
Saskatoon with random checks of pulps and rejects performed by Chemex Labs of
Vancouver. All core intervals have been fire assayed with a gravimetric finish
with samples that assayed greater than 10 grams per tonne checked by a total
metallics assay. With few exceptions, metallic assays have returned higher
values than those reported by conventional methods. The qualified person on
this project is Philip E. Olson P.Geo. (Sask).
The analogies between this new discovery and large tonnage well-known
calc-silicate hosted deposits are deemed encouraging by the Company's
management.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext