Claude Resources Inc. - Placer Dome Ramps Up Exploration At Madsen
      SASKATOON, Sept. 5 /CNW/ -  Placer Dome Canada Limited ("Placer") has significantly increased exploration activity on Claude Resources Inc. ("Claude") Madsen property in Red Lake, Ontario as a result of a number of high grade intersections. To date in 2003, thirty-six holes totalling about 20,000 metres have been drilled on multiple target areas (Russett North, Devilliers, Creek, Footwall Tuff and Mine East).     Results from the Russett North zone are particularly encouraging with quartz-tourmaline, quartz-carbonate and colliform carbonate veining being intersected routinely. Visible gold ("VG") was observed in a number of holes with several returning assays that confirm the high-grade nature of this carbonatized mafic-ultramafic terrain. The Phase II expansion drilling     (100-metre centres) of the Russett North zone started to vector in on a segment of this terrain referred to as the Treasure Box. Building on encouraging results from the 2002 drill program (see March 24th, 2003 press release on Claude's website), another three holes within this corridor encountered significant intersections in terms of both grade and width (see table below).
      <<                          RUSSETT NORTH/TREASURE BOX
      Drill Hole From (m)  To (m) Interval Grade (gpt)  VG   Comments     ------------------------------------------------------------------------     PDM03-27    107.04  108.29      1.25       3.22        Quartz-tourmaline                                                             veining     ------------------------------------------------------------------------     PDM03-27    111.04  112.26      1.22       9.86        Quartz-tourmaline                                                             veining     ------------------------------------------------------------------------     PDM03-27    332.62  335.06      2.44       7.59  Yes    Quartz-carbonate                                                              veining     ------------------------------------------------------------------------     PDM03-27    343.17  344.39      1.22       4.07         Quartz-carbonate                                                              veining     ------------------------------------------------------------------------     PDM03-29     74.45   75.52      1.07       4.31      Colliform carbonate                                                           veining     ------------------------------------------------------------------------     PDM03-29     80.70   84.94      4.24      17.81  Yes   Quartz-tourmaline                                                             veining     ------------------------------------------------------------------------     PDM03-30    321.01  322.10      1.10       1.12           Quartz-epidote                                                                stringer     ------------------------------------------------------------------------     PDM03-30    344.48  346.03      1.55      21.10  Yes       Quartz-pyrite     ------------------------------------------------------------------------     PDM03-32    164.63  165.85      1.22       1.13  Yes                Vein     ------------------------------------------------------------------------     PDM03-32    510.76  511.52      0.76       3.63  Yes    Vein, tourmaline     ------------------------------------------------------------------------     PDM03-33    328.51  329.15      0.64       1.09           Quartz veining     ------------------------------------------------------------------------
      Elsewhere on the property, Phase I drilling near the past-producing Starratt-Olsen mine, intersected known Devillier & Creek zones as well as a new sheared and altered sulfide replacement zone in the mine's footwall which was named the Footwall Tuff zone. Results from this target area are listed in the ensuing table. The significance of this new zone will be assessed in subsequent drill phases.
          Zone                 From       To             Grade      Project    Drill Hole   (m)        (m) Interval   (gpt)  VG    Comments     ------------------------------------------------------------------------     Devilliers   PDM03-150  131.71  132.84    1.13     1.51        Sulfide                                                                  replacement     ------------------------------------------------------------------------     Devilliers   PDM03-150  137.86  146.52    8.66     1.24        Sulfide                                                                  replacement     ------------------------------------------------------------------------     including    PDM03-150  137.86  140.43    2.56     3.26  Yes      Quartz                                                                      veining     ------------------------------------------------------------------------     Footwall     PDM03-150  455.61  456.52    0.91     3.27        Sulfide      Tuff                                                        replacement     ------------------------------------------------------------------------     Footwall     PDM03-150  458.66  460.00    1.34     1.27        Sheared      Tuff                                                       Tuff/sulfide     ------------------------------------------------------------------------     Creek        PDM03-151  112.84  113.14    0.30     1.55        Sulfide                                                                  replacement     ------------------------------------------------------------------------     Footwall     PDM03-151  326.62  327.23    0.61     2.87          Epidote      Tuff                                                            veining     ------------------------------------------------------------------------     Footwall     PDM03-151  339.94  345.09    5.15     1.63  Yes   Sulfide      Tuff                                                        replacement     ------------------------------------------------------------------------     including    PDM03-151  343.90  344.81    0.91     5.13  Yes    Sulfide                                                                  replacement     ------------------------------------------------------------------------     Devilliers   PDM03-154  166.55  167.77    1.22     8.55  Yes      Quartz                                                                      veining     ------------------------------------------------------------------------     Creek        PDM03-156  122.71  123.57    0.86     1.78         Sulfide                                                                  replacement     ------------------------------------------------------------------------     >>
      Momentum for the Madsen project is building as evidenced by a number of key infrastructure improvements including the construction of a 5.5-kilometre, all season, access road to the Russett North area and by increasing project personnel to 14 geologists and support staff to handle the enormous volume of core generated by the project. In excess of twenty kilometres of core has been drilled in 2003, however, about one third of the drill holes have yet to be logged, assayed and reported in their entirety.     Placer has undertaken extensive geophysics and 3D modeling of the Madsen property and will initiate a major trenching program shortly on the Treasure Box area prior to beginning Phase III drilling (25-50 metre centers) later this fall.     Placer Dome has the right to earn a 55% interest in Claude's 10,500-acre Madsen property by spending CDN $8.2 million prior to the end of 2004 and delivering a bankable feasibility study over the following two years.     Assaying and associated quality control of the Madsen core was done by Chemex Laboratories under the supervision of Yuri Dobrotin, P. Geo., Placer Dome District Geologist.
      Maps of the work area are available on Claude's website at www.clauderesources.com.
  -30-
  For further information: Philip E. Olson, P. Geo., Vice-President,  Exploration, (306) 668-7505, Neil McMillan, President, (306) 668-7505
  newswire.ca |