We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Novosibirskenergo

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Copperfield who started this subject8/25/2004 12:34:44 AM
From: Copperfield   of 18
 
The sixth power unit today gave the first energy in the network

translated - unedited


Pre-operational works on the 6th power unit of Novosibirsk TETs-5 entered the completing stage. As it communicated, On 10 August was produced the firing up of petroleum residue on theboiler of power unit and the steam testing of boiler is begun.
Selfless, the impact labor of workers, specialists and the leaders of object ensures the accomplishment ofthe strategic objective of 2004, the main investment project OF JOINT STOCK COMPANY"novosibirskenergo".
On 23 August is assembled the working the schematic of power unit, are begun starting operations on the block ¹'. The push of the rotor of turbogenerator is produced, vibration state is checked, and turbine unit was brought out to rated r - 3000 aboutmin. The tests of the control system of turbine and the electrical tests ofgenerator are produced.
5 hours 17 minutes 24.08.2004 power unit is connected to network forthe testing under the load.
It is planned to collect peak load on the power unit and to fix allsystems of automation and regulation of steam generator and turbine. After the end of these works the block will be stopped for eliminatingthe defects revealed during the testing and then it is again set inoperation for the complex testing for 72 hours under the load.
Moral attitude of the people speaks about the much: "we with our own eyes see fruits of our labor, it is honest to say, hands missed badly from the work, indeed the last introduction of power unit was, here to Ntets-shch, 10 years ago. Now, when it was possible to carry out my dream, to see the completion of the building of power station. - I is properly happy ", - says Aleksandr Semenov, the colleague for the administration of the investments OF JOINT STOCKCOMPANY "novosibirskenergo", one of the oldest workers of Novosibirsk TETs-5, stood at the sources of his development.


the Press- service

24 August 2004.