We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mosenergo ADR

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Copperfield who started this subject9/6/2004 9:29:47 AM
From: Copperfield   of 241
 
The HYDROELECTRIC POWER STATION - 1 of Open Society " Mosenergo " finishes installation new ýíåðãîòóðáèíû

translated - unedited

06.09.2004.
Moscow

On HYDROELECTRIC POWER STATION - 1 him(it). P.G.Smidovicha is conducted installation of new turbine R-12. The turbine will be started up in operation before winter colds.

Installation of the turbine is carried out(spent) within the framework of the scale program of equipment of HYDROELECTRIC POWER STATION - 1 by the newest high-efficiency equipment which realization is designed till 2008. Cost of works on installation of the new turbine, including expenses for auxiliaries, has made 135 million roubles. Financing was carried out completely from own means of the power company.

Turbine R-12 made by Open Society " Kaluga turbine factory ", has 12 ÌÂò electric and 30 Ãêàë thermal capacity. New ýíåðãîîáîðóäîâàíèå it is established instead of a developing resource of the first domestic òåïëîôèêàöèîííîé the turbine working on HYDROELECTRIC POWER STATION - 1 since 1933. As a result of modernization the problem(task) of increase of reliability of supply of consumers by the electric power and a heat during the winter period as before HYDROELECTRIC POWER STATION - 1 capacity for passage of a maximum of loading has hardly sufficed will be solved. Since 2004 even more reliable and steady power supply of consumers will be guaranteed.

The HYDROELECTRIC POWER STATION - 1 provides with thermal and electric energy the Central district of Moscow, including such objects, as: the Kremlin, the State Duma of the Russian Federation, the Old area, Ëóáÿíñêàÿ the area. In total established capacity of HYDROELECTRIC POWER STATION - 1 him(it). P.G.Smidovicha makes 72,7 ÌÂò, the power station develops more than 395 million êÂò·÷ electric energy and releases(lets off) 2080 thousand. Ãêàë thermal energy in a year.

The HYDROELECTRIC POWER STATION - 1 - the oldest power station of Open Society " Mosenergo " - have been entered into operation on November, 28, 1897. In 1899-1900 the power station has provided with an electricity of a line of the first Moscow trams. Introduction began with HYDROELECTRIC POWER STATION - 1 in the Russian power of new technologies and the equipment, raising reliability and an overall performance of the power stations reducing their harmful influence on an environment. On August, 13, 2004 HYDROELECTRIC POWER STATION - 1 him(it). P.G.Smidovicha has been appropriated(given) the status of a monument of a history and culture.