We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Golden Arch Resources---GAI.V
GAI 8.8000.0%Mar 22 5:00 PM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: CB. who wrote (205)8/26/1997 10:32:00 AM
From: CB.   of 359
 
The following is the response I received recently from Richard Watson in answer to questions that I asked of Oak Mgmt on August 8 (Post #205 GAI thread).

"CB,
The planned website is underway, and in answer to your questions:

1. 4-5 wells are planned. Wells are still planned although time may run
out, in which case drilling will continue into 1998.

2. Next well location should be identified in 2-3 weeks

3. 45-60 days to drill date.

4. Complete & interpretation of results are expected in 2 weeks at which
time the next location will be selected.

5. IP test 322 BOPD @ 110 Flowing tubing pressure. For consevation
purposes and inorder to extract maximum reserves the Jan 1 well was
originally put on line flowing @ 100 BOPD- it is currently flowing 110
BOPD with a 200 lb flowing tubing pressure . Field engineer advises that
bottom hole pressure has now increased 7 PSI from initial test. This means
the formation is cleaning up and flow may increase. The object of
conservative production rate is to recover initial investment from flush
production before pumping or lifting costs are incurred.

6. Oil sales have begun @ 1.29/B over N. Dakota posted price.

Richard Watson"

CB.