Nikolayevskeye Heat and Power Plant .............................
  Press releases 
  24.11.2004: On Nikolayevskeye TETS - HEAT AND POWER PLANT is completed the  innovation repair of boiler # 6 
  In the course of the month the boiler will work in the regime of controlled operation, and then it will arise in the reserve, which will make it possible to ensure the uninterrupted power supply of users Nikolayevsk-on- Amur under the conditions of peak loads. 
  In the course of preparation for the winter on Nikolayevskeye TETS - HEAT AND POWER PLANT routine repair passed all boilers, turbine, accessory equipment, the tank economy of station. Is fully supplied with fuel- - 130 thousand tons of petroleum residue. 
  The program of control of expenses realizes at the station, measures of which are directed toward the rational and effective use of a fuel, materials, resources, financial means. Only in 3 quarters Nikolayevskiye of power engineering saved two thousand tons of petroleum residue due to the liquidation of "bottlenecks" on the equipment, cleaning the surfaces of regenerative air heater, and also due to the restoration of the heat insulation of paromazutoprovoda. 
  Press- service JOINT STOCK COMPANY "Khabarovskenergo" |