SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : ATCO -- Breakthrough in Sound Reproduction
ATCO 15.480.0%Mar 28 5:00 PM EST

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: Savant3/6/2005 1:51:59 PM
   of 2062
 
IROS3, Increment One for 2005..note the Long Range Acoustic Device inclusion
****
Integrated Radar/Optical Sighting and

Surveillance System (IROS3)

Description: This is the Situational Awareness component of the

S h i pboa rd Pro tecti on Sys tem (SPS) In c rem ent on e . I RO S 3

employs COTS-based / Open Architecture products, and its key

components inc lude SPS-73 or equivalent surface search radar,

electro-optical/infra-red devices, an integrated surveillance system

, spotlights ,*** long range acoustic devices ***, and remotely

operated stabilized small arms mounts. A prototype system is

installed in USS Ramage to gain fleet feedback, lessons learned,

and integrated logistics support information.

SPS increment I is designed to augment current Naval Force

Protection Tactics and Doctrine by providing a means to detect,

classify and engage real-time asymmetric threats at close-range to

ships in port, at anchor, and while transiting choke points or

operating in restricted waters. The system provides 360-degree

Situational Awareness (SA) and employs COTS integration to

support incremental modifications as needed to tailor the system

to the mission. IROS3 provides the capability to bridge cur rent

and future technology to ships by integrating current Force

Protection initiatives and combat system technologies while sustaining

mission-capable combatant force levels.

Program Status: CDD is scheduled for completion in September

2004. CPD will follow to set up for FY 05 procurement. **Current

PB05 funding*** procures approximately 75 ship sets.

chinfo.navy.mil

From 9/04, I don't recall seeing LRAD written out like that previously (Long Range Acoustic Device)...it's always been AHD or Acoustic Hailing Device...hmmm, 75 in '05? Sets. Well, that was the Vision, now for the Reality..soon?
Best,
Savant
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext