SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Stealth Mining Corp. [SAL:ASE]

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Dav!d who wrote (70)9/10/1997 12:57:00 PM
From: StockPro   of 130
 
Hi David ... let's hope you're right!
Here's the latest news release ... looks good!


Pine zone initial drilling results
Stealth Mining Corp SAL
Shares issued 7600000 1997-09-09 close $0.69
Wednesday Sep 10 1997

Mr Bradley Jones reports
The company has commenced the initial drilling results (three
holes 1997-1, 1997-2 and 1997-3) from its 1997 diamond drilling
program of a minimum of 5000 feet (approximately 1700 metres)
in the Pine zone of its core property in Northern BC in the
southern part of the Toodoggone gold district.
Previous drilling identified a large gold rich porphyry copper
system (Pine zone) indicating a geological reserve of 40 million
tonnes grading 0.57 g/t gold (approximately 700,000 troy oz) and
0.15% copper (approximately 115,000,000 lb).
The property is approximately 8km north of the Kemess gold
copper deposit which is being readied for production by Royal
Oak Mines in the second quarter of 1998.
Hole 1997-1
Drill hole 1997-1 was stepped out approximately 100 metres
northwest of the initial drilling. The hole was drilled at an angle of
60 degrees and to a length of 90.9 metres. Mineralization
occurred from 13.0 metres to 90.9 metres and samples assayed
up to 1.03 g/t gold (over a width of 3.4 metres) and 0.24% copper
(over a width of 2.1m). From metre 28.0 to metre 44.5 for a total
of 16.5 metres weighted average grades returned 0.66 g/t gold
and 0.13% copper.
Drill Hole 1997-2
Drill hole 1997-2, approximately 700 metres northeast of drill hole
1997-1, was drilled at an angle of 60 degrees to a length of 160
metres. The hole was mineralized from 9.1 metres to 157.0
metres and samples assayed up to 1.69 g/t gold (over a width of
3.0m) and 0.18% copper (over a width of 3.0m). From metre 98.2
to metre 138.0 for a total of 39.8 metres weighted average grades
returned 0.64 g/t gold and 0.08% copper.
Drill Hole 1997-3
Drill hole 1997-3, approximately 200 metres south of drill hole
1997-1 and approximately 800 metres southeast of drill hole
1997-2, was drilled at an angle of 45 degrees to a length of 169.5
metres. The hole was mineralized from 5.3 metres to 164.9
metres and samples assayed up to 5.21 g/t gold (over a width of
1.0 metres) and 0.40% copper (over a width of 1.1 metres). From
metre 77.1 to metre 89.0 for a total of 11.9 metres weighted
average grades returned 0.73 g/t gold and 0.30% copper.
These drilling results support the potential for a much larger
reserve from the original 40 million tonnes grading 0.57 g/t gold
(approximately 700,000 troy oz) and 0.15% copper
(approximately 115 million lb). It is the company's goal to develop
the Pine zone into a large gold copper porphyry deposit similar to
Southern Kemess.
The drilling is continuing and future results will be released as
assays are received.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext