SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Gold and Silver Juniors, Mid-tiers and Producers

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: loantech11/25/2005 11:10:24 AM
   of 78413
 
Capstone news:

Capstone Gold Corp
Symbol CSG
Shares Issued 43,842,889
Close 2005-11-24 C$ 0.97
Recent Sedar Documents



Capstone intersects 8 m grading 147.7 g/t Ag at Cozamin

2005-11-25 10:07 ET - News Release

Mr. Chris Tomanik reports

CAPSTONE INTERSECTS 8.0 M OF 147.7 G/T SILVER AND 8.3% COPPER AT THE COZAMIN MINE, ZACATECAS STATE, MEXICO

Capstone Gold Corp. is providing copper assay results from 10 underground core holes at Capstone's Cozamin copper-silver-zinc mine located in Zacatecas, Mexico. The unreported silver values will be released when the pending assays are received. These latest intercepts, along with the intercepts reported in Stockwatch on Nov. 16, 2005, will be part of an updated resource estimate that will upgrade the previously reported inferred resources and add to the measured and indicated categories. These reported drill holes continue to confirm that the grade of copper mineralization increases with depth. The Mala Noche vein mineralization remains open along strike (east-west) and down dip.

Current drill results include:

CG-05-U75: eight metres grading 147.7 grams per tonne (g/t) silver (Ag) and 8.3 per cent copper (Cu)

CG-05-U78: 11.2 metres grading 3.3 per cent Cu

CG-05-U84: 5.6 metres grading 4 per cent Cu

NQ core From To Inter- Inter-
hole No. (m) (m) val section
(m) true
width (i)

CG-05-U75 155.5 163.5 8.0 5.6

CG-05-U77 252.8 257.0 4.2 1.6

CG-05-U78 95.0 107.0 12.0 11.2

CG-05-U79 162.3 165.5 3.2 2.3

CG-05-U80 198.0 214.5 16.5 7.8
Including 205.0 214.5 9.5 4.5

CG-05-U81 107.0 110.8 3.8 2.6
And 129.3 135.0 5.7 3.9

CG-05-U82 188.3 197.0 8.7 4.5

CG-05-U84 147.5 155.8 8.3 5.6
Including 148.0 150.5 2.5 1.7

CG-05-U87 159.0 169.0 10.0 4.5
Including 162.5 166.5 4.0 1.8

CG-05-U88 181.5 193.0 11.5 5.4
Including 184.8 189.0 4.2 2.0

NQ core Ag Cu Zn
hole No. (g/t) (%) (%)

CG-05-U75 147.7 8.3 0.3

CG-05-U77 pending 1.1 1.7

CG-05-U78 pending 3.3 1.7

CG-05-U79 86.9 2.1 2.8

CG-05-U80 pending 2.9 0.9
Including pending 4.2 1.0

CG-05-U81 pending 2.1 0.3
And pending 2.0 0.1

CG-05-U82 pending 2.9 0.6

CG-05-U84 pending 4.0 2.2
Including pending 9.5 0.3

CG-05-U87 pending 2.1 1.9
Including pending 3.8 2.2

CG-05-U88 pending 2.8 1.6
Including pending 4.8 1.3

(i) True widths are estimated by correcting for the strike and dip of the vein with regard to the bearing and inclination of the hole.

The highlighted holes on the attached longitudinal section were not included in the previous resource estimate and will be part of an updated resource estimate that will upgrade the previously reported inferred resources and add to the measured and indicated categories.

A longitudinal section with current and previous drill hole pierce points and grades may be found on Capstone's website.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext