SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : I Will Continue to Continue, to Pretend....

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Sully- who wrote (14578)12/3/2005 1:01:11 AM
From: Sully-   of 35834
 
THE "COSTLIEST ENGINEERING MISTAKE IN AMERICAN HISTORY:"

Instapundit

<<<

The floodwall on the 17th Street Canal levee was destined to fail long before it reached its maximum design load of 14 feet of water because the Army Corps of Engineers underestimated the weak soil layers 10 to 25 feet below the levee, the state's forensic levee investigation team concluded in a report to be released this week.

That miscalculation was so obvious and fundamental, investigators said, they "could not fathom" how the design team of engineers from the corps, local firm Eustis Engineering and the national firm Modjeski and Masters could have missed what is being termed the costliest engineering mistake in American history. . . .

"It's simply beyond me," said Billy Prochaska, a consulting engineer in the forensic group known as Team Louisiana. "This wasn't a complicated problem. This is something the corps, Eustis, and Modjeski and Masters do all the time. Yet everyone missed it -- everyone from the local offices all the way up to Washington."
>>>

This will cause a lot of conspiracy theories to unravel.

instapundit.com

nola.com
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext