SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Gold and Silver Juniors, Mid-tiers and Producers

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
From: LoneClone6/22/2006 9:41:21 AM
  Read Replies (1) of 78413
 
Scorpio's Drilling from 8 Level of Nuestra Senora Silver Mine Extends Mineralization, including 7.90 metres of 662.47 g/t Ag, 7.87% Zn, 1.27% Cu, 4.23% Pb and 0.39 g/t Au
Thursday June 22, 9:00 am ET

ca.us.biz.yahoo.com

VANCOUVER, June 22 /CNW/ - Scorpio Mining Corporation (TSXV:SPM) is pleased to announce underground assay results of ongoing drilling from the 8th level of the Nuestra Senora silver mine located near Cosala, Sinaloa State, Mexico (Table 1).
Peter J. Hawley, President and CEO reports, "Our definition drilling from the 8th level has encountered an extension of mineralization not tested by previous operator, ASARCO. The mineralized zone extends to the south outside and away from the developed area, and is open on strike. Our exploration drilling will continue to test the north and south strike extensions of this zone, which along with the new Hoag discovery, greatly enhances our opportunity to add to the growing resource base at Nuestra Senora."

As previously released, the mapping and sampling of the 8th level indicates that the mineralized envelope is approximately 100 metres in width. Channel chip sampling continues to return consistent metal grades, which also correlate well with results from the 7th level, 30 metres vertically above.

TABLE 1. Nuestra Senora Deposit - 8 Level Drilling Results

-------------------------------------------------------------------------
Hole No. From To Length Ag Au Cu Pb Zn
(m) (m) (m) (g/t) (g/t) % % %
-------------------------------------------------------------------------
NS8L-06-01 35.80 43.90 8.10 123.73 0.30 0.07 1.45 2.53
-------------------------------------------------------------------------
Including 35.80 38.80 3.00 261.33 0.65 0.08 3.09 5.07
-------------------------------------------------------------------------
NS8L-06-02 12.10 13.50 1.40 203.07 0.15 0.08 1.16 0.59
-------------------------------------------------------------------------
29.40 32.00 2.60 132.77 0.09 0.00 0.24 0.03
-------------------------------------------------------------------------
37.50 38.50 1.00 307.00 0.21 0.49 0.78 1.45
-------------------------------------------------------------------------
NS8L-06-03 12.40 18.10 5.70 142.25 0.23 0.11 1.24 0.87
-------------------------------------------------------------------------
Including 12.40 14.40 2.00 208.50 0.27 0.17 1.66 1.61
-------------------------------------------------------------------------
35.80 36.60 0.80 693.00 1.18 0.62 9.85 22.60
-------------------------------------------------------------------------
NS8l-06-04 19.80 21.80 2.00 242.50 0.22 0.05 0.84 0.51
-------------------------------------------------------------------------
24.60 26.60 2.00 92.50 0.20 0.10 1.34 1.74
-------------------------------------------------------------------------
NS8l-06-05 11.90 12.90 1.00 118.00 0.16 0.00 0.43 0.02
-------------------------------------------------------------------------
NS8l-06-05A 27.20 33.00 5.80 210.62 0.20 0.09 2.13 1.46
-------------------------------------------------------------------------
65.40 66.30 0.90 406.00 0.82 0.99 4.30 4.92
-------------------------------------------------------------------------
NS8L-06-06 31.20 35.20 4.00 115.38 0.19 0.04 0.56 0.12
-------------------------------------------------------------------------
56.00 56.90 0.90 901.00 13.20 2.89 1.58 3.73
-------------------------------------------------------------------------
NS8L-06-07 23.60 27.60 1.00 206.00 0.24 0.01 0.50 0.02
-------------------------------------------------------------------------
31.20 34.80 3.60 229.36 0.22 0.00 0.52 0.07
-------------------------------------------------------------------------
NS8L-06-08 28.40 31.40 3.00 203.33 0.21 0.02 0.58 1.91
-------------------------------------------------------------------------
NS8L-06-09 23.30 25.90 2.60 220.58 0.21 0.05 0.87 1.57
-------------------------------------------------------------------------
46.60 48.40 1.80 246.00 0.59 1.32 6.06 11.14
-------------------------------------------------------------------------
NS8L-06-09A 23.30 25.90 2.60 220.58 0.21 0.05 0.87 1.57
-------------------------------------------------------------------------
46.60 48.40 1.80 246.00 0.59 1.32 6.06 11.14
-------------------------------------------------------------------------
NS8L-06-10 26.70 29.10 2.40 213.13 0.36 0.03 0.83 1.56
-------------------------------------------------------------------------
NS8L-06-12 17.40 18.10 0.70 277.00 0.15 0.00 1.13 2.27
-------------------------------------------------------------------------
26.80 27.60 0.80 244.00 0.11 0.01 0.64 0.06
-------------------------------------------------------------------------
NS8L-06-12A 20.10 21.70 1.60 118.13 0.15 0.00 0.18 0.02
-------------------------------------------------------------------------
25.30 27.75 2.45 110.47 0.10 0.01 0.28 0.03
-------------------------------------------------------------------------
NS8L-06-13A 19.10 21.00 1.90 1,046.21 0.28 0.02 2.14 4.39
-------------------------------------------------------------------------
NS8L-06-14 21.50 22.90 1.40 114.00 0.19 0.01 0.39 0.28
-------------------------------------------------------------------------
29.90 31.65 1.75 201.57 0.21 0.33 0.28 1.82
-------------------------------------------------------------------------
49.40 50.50 1.10 155.82 0.12 0.28 1.16 1.38
-------------------------------------------------------------------------
NS8L-06-14A 12.10 14.10 2.00 163.63 0.29 0.02 0.73 0.97
-------------------------------------------------------------------------
21.50 22.60 1.10 120.00 0.11 0.01 0.53 0.67
-------------------------------------------------------------------------
86.30 87.80 1.50 268.00 0.01 0.00 0.21 0.02
-------------------------------------------------------------------------
NS8L-06-15 37.00 38.00 1.00 362.00 0.20 0.02 1.55 0.62
-------------------------------------------------------------------------
69.10 77.00 7.90 662.47 0.39 1.27 4.23 7.87
-------------------------------------------------------------------------
82.60 83.30 0.70 231.00 0.18 0.05 1.82 5.58
-------------------------------------------------------------------------
NS8L-06-15A 18.00 23.00 5.00 78.20 0.09 0.12 1.31 1.51
-------------------------------------------------------------------------
19.00 20.00 1.00 124.00 0.09 0.36 4.07 4.08
-------------------------------------------------------------------------
'A' designates a hole drilled at +20 degrees dip; all others are
horizontal

Drill hole data reflect down hole core lengths and actual (uncut) grades. True widths cannot be reliably estimated at this time.
As of June 14, 2006, 1,015 metres of ramp advance and 1,017 metres of exploration crosscuts, drifts and drill bays have been excavated within the Nuestra Senora deposit. Underground drilling now totals 16,838 metres and a surface drill has commenced testing the downward extension of the new Hoag Zone discovery.

Vice President, Exploration & Development, Mr. D. Roger Scammell, PGeo, is the Company's Qualified Person for the Nuestra Senora project. Mr. Scammell is responsible for the current exploration and development program and the preparation of all technical information provided in this release. All technical information for the Nuestra Senora property is obtained and reported under a formal quality assurance and quality control (QA/QC) program. Samples are shipped to the ALS Chemex preparation laboratory in Hermosillo, Mexico for drying, crushing and pulverizing. ALS Chemex, Hermosillo then sends the pulps by air-freight to ALS Chemex, Vancouver for assaying. Systematic assaying of standards and blanks are performed for precision and accuracy; check assays are regularly conducted by SGS Lakefield Research. Details of the QA/QC program are available on the Company's website at www.scorpiomining.com.

ON BEHALF OF SCORPIO MINING CORPORATION

Peter J. Hawley
President & CEO

The TSX Venture Exchange has not reviewed and does not accept
responsibility for the adequacy or accuracy of the content of this news
release.

This discussion includes certain statements that may be deemed "forward-looking statements". All statements in this discussion, other than statements of historical facts, that address future exploration drilling, exploration activities and events or developments that the Company expects, are forward looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include metal prices, exploration successes, continued availability of capital and financing, and general economic, market or business conditions.
For further information

Glenn Little, Jackson Little Holdings Ltd: (604) 930-4375, 1-888-930-4375, Email: jlconsulting@telus.net
Rich Kaiser, YES International: 1-800-631-8127, 001-757-306-6090 (outside North America), Email: yes@yesinternational.com

--------------------------------------------------------------------------------
Source: Scorpio Mining Corporation
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext